FIR15-00308
| INSP-Sprinkler Rough-in/Hydro | 6/2/2015 | 6/2/2015 | 6/3/2015 7:42:48 AM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR15-00324
| INSP-Sprinkler Rough-in | 6/2/2015 | 6/2/2015 | 6/3/2015 7:04:51 AM | P | PASS |
|
|
See the city approved plans marked that are ok to cover sprinkler piping
|
BLD15-01260
| FIRE-Final Inspection | 6/2/2015 | 6/2/2015 | 6/3/2015 6:51:49 AM | P | PASS |
|
|
life safety passed
|
FIR15-00319
| INSP-Sprinkler Rough-in/Hydro | 6/1/2015 | 6/2/2015 | 6/2/2015 1:43:56 PM | P | PASS |
|
|
Rough-in passed. No tenting installed yet.
|
FIR15-00346
| INSP-Sprinkler Rough-in | 6/1/2015 | 6/2/2015 | 6/2/2015 11:01:47 AM | A | PASS |
|
|
See the city approved plans for the rooms marked "ok" where piping can be covered.
|
FIR15-00351
| INSP-Sprinkler Rough-in | 6/1/2015 | 6/2/2015 | 6/2/2015 10:52:02 AM | A | PASS |
|
|
Underground supply piping is ok to bury
|
GRD14-00026
| FIRE-Final Inspection | 6/1/2015 | 6/2/2015 | 6/2/2015 10:16:31 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00316
| INSP-Alarm Testing | 6/1/2015 | 6/2/2015 | 6/2/2015 9:25:18 AM | A | PART |
|
|
A temporary is being given until the door mag in the warehouse has been addressed.
|
FIR15-00064
| INSP-Sprinkler Rough-in | 6/1/2015 | 6/2/2015 | 6/2/2015 9:24:16 AM | A | PART |
|
|
This inspection should have been scheduled as a final. A temporary occupancy is being given until the hvac shutdown, door mags and 3rd floor is complete.
|
BLD14-03545
| FIRE-Final Inspection | 5/29/2015 | 6/2/2015 | 6/2/2015 9:22:29 AM | A | PART |
|
|
A temporary occupancy for the life safety is being given for the 1st and 2nd floors until the 3rd floor is complete. The door mags and the hvac shutdown, as previously discussed, needs to be addressed prior to a final sign off.
|
BLD14-02796
| FIRE-Final Inspection | 6/1/2015 | 6/2/2015 | 6/2/2015 12:00:00 AM | A | CANC |
|
|
Zach Phone #: ###-####
|