ELE13-02121
| ELE-Aging Inspection | 6/2/2016 | 6/2/2016 | 6/3/2016 2:39:48 PM | | CANC |
|
|
|
ELE13-01456
| ELE-Aging Inspection | 6/2/2016 | 6/2/2016 | 6/3/2016 2:39:33 PM | | CANC |
|
|
|
ELE12-01594
| ELE-Aging Inspection | 6/2/2016 | 6/2/2016 | 6/3/2016 2:39:25 PM | | CANC |
|
|
|
ELE15-00495
| Electrical Rough-In | 6/2/2016 | 6/2/2016 | 6/2/2016 3:33:09 PM | P | PASS |
|
|
First floor wall cover inspection. Contact is Eric Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves 1st floor north corridor and bathrooms wall rough in ok cover noted in book in red.
|
ELE16-01750
| Conference | 6/2/2016 | 6/2/2016 | 6/2/2016 3:17:26 PM | P | DONE |
|
|
Robert. Conference. Phone #: ###-#### Inspection requested via web by Sean DeLacy Discussed the installation of LED drivers for indirect lighting in wood slats. Drivers shall be contained in hat channel due to no way for connector to terminate at driver.
|
ELE16-01651
| Final | 6/1/2016 | 6/2/2016 | 6/2/2016 1:08:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JOHN MCCURDY needed rough in inspection Bonding complete and GFCI protection installed on all circuits. Final ok
|
ELE16-01651
| Electrical Rough-In | 6/2/2016 | 6/2/2016 | 6/2/2016 1:07:45 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Underground from house to fence and ran above ground in schedule 80 to equipment panel. Rough in ok cover
|
ELE13-01291
| Electrical Rough-In | 6/1/2016 | 6/2/2016 | 6/2/2016 12:07:54 PM | A | PASS |
|
|
electrical rough in inspection for event lawn underground near corner of 9th and front . Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson South portion of event lawn underground rough in ok cover
|
ELE15-02740
| Electrical Rough-In | 6/1/2016 | 6/2/2016 | 6/2/2016 10:30:24 AM | A | PASS |
|
|
Seth Phone #: ###-#### 1st floor meeting rm, breakfast area and pantry wall rough in ok cover
|
ELE16-00749
| Final | 6/1/2016 | 6/2/2016 | 6/2/2016 9:56:30 AM | A | PASS |
|
|
Request for final. Thank you, Monica Lehman Phone #: ###-#### Inspection requested via web by Monica Lehman final ok
|
ELE16-00222
| Final | 6/1/2016 | 6/2/2016 | 6/2/2016 9:33:44 AM | A | PART |
|
|
Andy Phone #: ###-#### 2nd floor temp final ok
|
ELE16-01838
| Electrical Rough-In | 6/2/2016 | 6/2/2016 | 6/2/2016 12:00:00 AM | A | CANC |
|
|
Level 1: Rms 102, 103 and conduit (in slab) Level 2: Stack 2,3,4 Ceilings Level 2: 212, 213, 214, 215, Stack 2 Exterior Walls, Stack 4 Soffit Level 7: 744, 745, 746, 747, 741, 740, 739, 737, 715, 716, 718, 719, 733, 732, 731, 730 core Level 9: Elec Room, IDF, Vestibule Phone #: ###-#### Inspection requested via web by Tom Betty
|