BLD20-01075
| FIRE-Conference | 6/1/2020 | 6/2/2020 | 6/2/2020 3:41:21 PM | P | DONE |
|
|
See the city approved plans for additional rooms verified for insulation in the attic space. Phone #: ###-#### Inspection requested via web by rick pew
|
BLD20-00599
| FIRE-Final Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 2:33:03 PM | P | PASS |
|
|
Life safety passd.
Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
|
BLD20-00522
| FIRE-Final Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 2:32:36 PM | P | PASS |
|
|
Life safety passed
Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
|
FIR20-00184
| INSP-Sprinkler Rough-in | 6/2/2020 | 6/2/2020 | 6/2/2020 1:27:40 PM | P | PASS |
|
|
IBR stub-out ok for cover. Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR19-00678
| INSP-Supply line flush | 5/29/2020 | 6/2/2020 | 6/2/2020 11:40:59 AM | A | PASS |
|
|
10am flushes on all three undergrounds witnessed. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00792
| INSP-Sprinkler Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 9:35:12 AM | A | PASS |
|
|
The piping above the soffits for the first and second floors can be covered. Tanner *screened* Phone #: ###-####
|
FIR20-00313
| INSP-Sprinkler Rough-in | 6/1/2020 | 6/2/2020 | 6/2/2020 9:34:32 AM | A | PASS |
|
|
The four pendants have been relocated and the two sidewall heads have been added at the first floor intermediate stair landings. Basically the 18 east most apartments rough-ins are passed. The first and second floor piping can be covered. The third floor piping can not be covered until a tenting inspection has been passed. Cam Hess is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|