Inspections for the day of: Tuesday, June 2, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01075 FIRE-Conference6/1/20206/2/20206/2/2020 3:41:21 PMPDONE
See the city approved plans for additional rooms verified for insulation in the attic space. Phone #: ###-#### Inspection requested via web by rick pew
BLD20-00599 FIRE-Final Inspection6/2/20206/2/20206/2/2020 2:33:03 PMPPASS
Life safety passd.

Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
BLD20-00522 FIRE-Final Inspection6/2/20206/2/20206/2/2020 2:32:36 PMPPASS
Life safety passed

Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison
FIR20-00184 INSP-Sprinkler Rough-in6/2/20206/2/20206/2/2020 1:27:40 PMPPASS
IBR stub-out ok for cover. Phone #: ###-#### Inspection requested via web by Brodie Stenquist
FIR19-00678 INSP-Supply line flush5/29/20206/2/20206/2/2020 11:40:59 AMAPASS
10am flushes on all three undergrounds witnessed. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR19-00792 INSP-Sprinkler Rough-in6/1/20206/2/20206/2/2020 9:35:12 AMAPASS
The piping above the soffits for the first and second floors can be covered. Tanner *screened* Phone #: ###-####
FIR20-00313 INSP-Sprinkler Rough-in6/1/20206/2/20206/2/2020 9:34:32 AMAPASS
The four pendants have been relocated and the two sidewall heads have been added at the first floor intermediate stair landings. Basically the 18 east most apartments rough-ins are passed. The first and second floor piping can be covered. The third floor piping can not be covered until a tenting inspection has been passed. Cam Hess is the contact Phone #: ###-#### Inspection requested via web by Stan Beus