Inspections for the day of: Tuesday, June 2, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00539 Site Final5/29/20206/2/20206/9/2020 11:51:44 AMPPASS
ESC16-00935 General Inspection5/27/20206/2/20206/3/2020 11:58:06 AMPPART
Silt fence has been removed, wood post and a t-post still installed.
Heard from source that drainage is flowing wrong way and onto hillside.
ESC19-00994 General Inspection6/2/20206/2/20206/3/2020 8:24:48 AM PASS
Gate into upper section closed.
Hillside has good growth. Wattle has been installed on BB road where water was causing rills. Upper berm repaired to direct water back onto road.
Heavy equipment operating on west side of road.
ESC19-00241 General Inspection6/2/20206/2/20206/3/2020 8:24:48 AM PASS
Parking lot and ring around school paved, behind school still bare. Outside work is masonary. Some small debris around site, some bare spots, nothing leaving site. Wattle perimeter still installed. Workers all parked on paved lot.
ESC19-00973 General Inspection6/2/20206/2/20206/2/2020 1:28:46 PM PASS
Home and walls completed, still needs landscaping.
ESC19-00927 General Inspection6/2/20206/2/20206/2/2020 1:25:20 PM PASS
No dust or tracking issues at site. Hillside still not tackified or seeded. Sprinkler flags installed, may be getting ready to install irrigation.
ESC16-00353 General Inspection6/2/20206/2/20206/2/2020 12:05:01 PM PASS
No new activity.
ESC18-01248 Aging Inspection6/2/20206/2/20206/2/2020 11:46:27 AM PASS
Work completed, regrowth under way, wattles still around perimeter.
ESC19-01550 Site Preparation6/2/20206/2/20206/2/2020 11:26:01 AMPPASS
No work on site. Permit was left at site, installed on fence for irrigation pump.
ESC20-00558 General Inspection6/2/20206/2/20206/2/2020 11:16:14 AMPFAIL
Washout dumped at end of block. Fee and hold assigned to other address. Besides washout site is clean, almost all foundations poured.
ESC20-00596 BMP Violation6/2/20206/2/20206/2/2020 11:15:22 AMPFAIL
Washout dumped on end of block. Fee and trade hold assigned to address, pictures sent to RP.
ESC19-00678 Site Final6/2/20206/2/20206/2/2020 11:03:11 AMPPASS
ESC20-00054 General Inspection6/2/20206/2/20206/2/2020 10:58:44 AMPPASS
No workers at ste. Water lines look like they are completed to pads. Rain left a nice crust on site.
ESC20-00051 DOC - Permit Finaled6/2/20206/2/20206/2/2020 10:45:00 AMPPASS
ESC20-00052 DOC - Permit Finaled6/2/20206/2/20206/2/2020 10:44:45 AMPPASS
ESC19-01309 DOC - Permit Finaled6/2/20206/2/20206/2/2020 10:44:17 AMPPASS
ESC19-01310 DOC - Permit Finaled6/2/20206/2/20206/2/2020 10:44:09 AMPPASS
ESC19-00886 General Inspection6/2/20206/2/20206/2/2020 10:40:52 AMPPASS
Exterior completed and lot landscaped. Crew on site, pallet of masonary rock out front.
ESC19-00839 General Inspection6/2/20206/2/20206/2/2020 10:32:26 AMPPASS
Southern section of lot is paved, crews working on sidewalk. Rumble strips are full of dirt, no longer forcing drivers over them. Site is still bare, has potential for dust or mud.
Trash is clean, site is clean, no current major issues.
ESC19-00181 General Inspection6/2/20206/2/20206/2/2020 10:32:11 AMPPASS
Southern section of lot is paved, crews working on sidewalk. Rumble strips are full of dirt, no longer forcing drivers over them. Site is still bare, has potential for dust or mud.
Trash is clean, site is clean, no current major issues.
ESC20-00144 General Inspection6/2/20206/2/20206/2/2020 9:56:21 AMPPASS
WIP on framing, no building waste around site.
Plan on pouring curbing next week, will have washout pan replaced before pour.
Water wagon on site for dust control, no tracking.