Inspections for the day of: Thursday, June 20, 1996.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC96-01729 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM NH
/ / 350 -
MEC96-01729 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM NH
/ / 350 -
MEC96-01739 INSP - Gas pressure test6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - NO TEST NEEDED ON PIPE ALL OUTSIDE TO POOL HEATER OK LEFT NO JOINTS WHEN GAS IS TURNED ON
MEC96-01751 INSP - Rough-in & Gas Pressure6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - R/I OK P/T OK #28233
MEC96-01759 INSP - Framing/ Rough-in6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - R/I OK FOR FRONT PART OF STORE WITH SHEETROCK CEILING
MEC96-00087 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM FAIL
/ / 350 - NO FINAL CORRECTIONS
MEC96-00087 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM FAIL
/ / 350 - NO FINAL CORRECTIONS
MEC96-01118 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - CORRECTION MADE FINAL
MEC96-01118 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - CORRECTION MADE FINAL
MEC96-01286 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - FINAL OK
MEC96-01286 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - FINAL OK
MEC96-01698 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - gas test ok meet contractor, furn. ok final
MEC96-01698 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AM PASS
/ / 350 - gas test ok meet contractor, furn. ok final
BLD96-00907 INSP - Footings6/19/19966/20/19966/20/1996 12:00:00 AMAPASS
06/20/96 350 - CHECK PIER PADS UNDER TRAILER BEFORE THEY LOWERED IT OK
BLD96-01073 INSP - Framing/Rough-in6/19/19966/20/19966/20/1996 12:00:00 AMAPASS
06/20/96 350 - CALL PAUL ###-#### BEFORE GOING OUT. (THIS SHOULD HAVE W AFTERNOON.) R/I FRAME OK PUT UP STICKER TO INSULATE
BLD96-01533 INSP - Roof6/19/19966/20/19966/20/1996 12:00:00 AMACANC
06/20/96 350 - THIS IS IN GARDEN CITY
MEC96-01760 INSP - Framing/ Rough-in6/19/19966/20/19966/20/1996 12:00:00 AMACANC
06/20/96 350 - DONE BY #337
MEC96-01763 INSP - Rough-in & Gas Pressure6/20/19966/20/19966/20/1996 12:00:00 AMPPART
06/20/96 350 - R/I OK P/T FAILED
MEC96-01765 INSP - Gas pressure test6/20/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - PRESSURE TEST OK #28229 FINAL
MEC96-01767 INSP - Retro Fit (check note)6/20/19966/20/19966/20/1996 12:00:00 AMPPART
06/20/96 350 - FURNACE GAS TEST W/H FURN. AND W/H NOT READY PRESSURE TEST IS OK #28224
MEC96-01768 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - OLD KMART BUILDING-LOBBY BLDG 24-RELOCATE 9 CEILING DEFUS OLSON ###-#### PAGER BLD96-1281-YMC JOB #M-6674-$500.00 FINAL OK
MEC96-01768 INSP - Final6/20/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - OLD KMART BUILDING-LOBBY BLDG 24-RELOCATE 9 CEILING DEFUS OLSON ###-#### PAGER BLD96-1281-YMC JOB #M-6674-$500.00 FINAL OK
BLD1053868 INSP - Framing/Rough-in6/19/19966/20/19966/20/1996 12:00:00 AMPNR
06/20/96 350 - THURS P.M.
BLD1053868 INSP - Energy code compliance6/19/19966/20/19966/20/1996 12:00:00 AMPNR
06/20/96 350 - THURS. P.M.
BLD96-00091 INSP - Framing/Rough-in6/19/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - CONF. ONLY WILL CALL FOR FRAME WHEN READY
MEC96-01706 INSP - Retro Fit (check note)6/20/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - ALL CORRECTIONS MADE FINAL
MEC96-01667 INSP - Rough-in & Gas Pressure6/20/19966/20/19966/20/1996 12:00:00 AMPPASS
06/20/96 350 - READY AFTER 3PM FURN OK W/H OK GAS BY GAS CO. FINAL