MEC97-01234
| INSP - Final | 6/20/1997 | 6/20/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/20/97 407 - late afternoon correction made, but on re-inspection a duct to the master bedroom has c appart from the supply boot.
|
MEC97-01234
| INSP - Final | 6/20/1997 | 6/20/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/20/97 407 - late afternoon correction made, but on re-inspection a duct to the master bedroom has c appart from the supply boot.
|
BLD96-01679
| INSP - Final | 6/19/1997 | 6/20/1997 | 6/23/1997 12:00:00 AM | P | FAIL |
|
|
06/20/97 407 -
|
BLD96-02125
| INSP - Energy code compliance | 6/19/1997 | 6/20/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/20/97 407 - energy ok,still have under floor floor joist over notch c sheetrock.
|
BLD97-00669
| INSP - Energy code compliance | 6/19/1997 | 6/20/1997 | 6/23/1997 12:00:00 AM | P | NR |
|
|
06/20/97 407 - LATE PM. not ready.
|
BLD97-00858
| INSP - Conference | 6/20/1997 | 6/20/1997 | 6/20/1997 12:00:00 AM | | PART |
|
|
/ / 407 - TALK WITH CORRY ABOUT GARAGE FRONT HOLD DOWNS. HE WAS NOT AW WOULD BE REQUIRED HE HAD AN EARLY START PERMIT, HE WILL BE SUBMITTING ENGINEERING.
|