ELE00-02301
| Final | 6/19/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | A | PASS |
|
|
KANDOR STE B\\###-#### Re-located light switches and fixtures. Completed 6/21/00 11:54:45 AM
|
ELE00-01938
| Rough-In Permanent Service | 6/19/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 12:09:40. Contact: ###-####. Ground-choke for EMT raceway for grounding conductor required. 6/21/00 11:56:16 AM
|
ELE00-01367
| Electrical Rough-In | 6/19/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 13:42:31. Contact: ###-####.---s.e. corner of the building Interior walls ele. R/I 6/21/00 11:54:54 AM
|
ELE99-04403
| Final | 6/19/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | A | PASS |
|
|
###-#### Corrections completed 6/21/00 11:24:07 AM
|
ELE00-00840
| Final | 6/19/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 16:13:14. Contact: ###-####. 4-plex; completed 6/21/00 11:54:24 AM
|
ELE00-02318
| Final | 6/20/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### call first homeowner contractor-###-#### will be there till 2:30 Hot tub 6/21/00 11:30:03 AM
|
ELE00-02322
| Temporary Service | 6/20/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | P | PASS |
|
|
###-#### Temp. pole 6/21/00 11:31:44 AM
|
ELE00-00888
| Electrical Rough-In | 6/20/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | P | PART |
|
|
grounding ###-#### Grounding to electrode; underground 6/21/00 11:29:58 AM
|
ELE00-00340
| Final | 6/20/2000 | 6/20/2000 | 6/20/2000 12:00:00 AM | P | FAIL |
|
|
###-#### DAVE No access; called contractor, used wrong case number, and contractor didn't perform roof-top A/C unit installation. 6/21/00 11:30:59 AM
|