Inspections for the day of: Tuesday, June 20, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00829 BLD-Footing6/19/20006/20/20006/20/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/19/2000 at 08:14:04. Contact: ###-####. Need new detail for step down 6/21/00 11:44:25 AM
BLD00-01586 BLD-Footing6/19/20006/20/20006/20/2000 12:00:00 AMAPASS
Jeremy ###-####
BLD00-00614 BLD-Foundation6/19/20006/20/20006/20/2000 12:00:00 AMAPART
stem wall ###-#### Jeremy HD's not in place incomplete 6/21/00 11:43:30 AM
BLD00-01119 BLD-Framing/Rough-in6/19/20006/20/20006/20/2000 12:00:00 AMAPASS
said that he made arrangements for 9am Brett ###-#### Need ok for notched micro 6/21/00 11:43:41 AM
BLD00-01533 BLD-Footing6/19/20006/20/20006/20/2000 12:00:00 AMAPART
Mana ###-#### Quik start looks ok W/Verba/corrections. 6/21/00 11:44:05 AM
BLD00-00956 BLD-Framing/Rough-in6/19/20006/20/20006/20/2000 12:00:00 AMPPASS
Tim 1###-####
BLD00-00966 BLD-Framing/Rough-in6/20/20006/20/20006/20/2000 12:00:00 AMPFAIL
bob--###-#### fr--re-insp C/N posted 6/21/00 11:43:14 AM
BLD00-00891 BLD-Final6/20/20006/20/20006/20/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/20/2000 at 08:16:30. Contact: ###-####. L/C issued. 6/21/00 11:43:08 AM
BLD00-00741 BLD-Final6/20/20006/20/20006/20/2000 12:00:00 AMPPASS
###-#### ext. 234 L/C issued. 6/21/00 11:42:53 AM
BLD00-01079 BLD-Framing/Rough-in6/19/20006/20/20006/20/2000 12:00:00 AMPFAIL
MIKE---###-#### FR C/N poste 6/21/00 11:43:00 AM
BLD00-00829 BLD-Foundation6/16/20006/20/20006/19/2000 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 06/16/2000 at 10:43:58. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/19/2000 at 08:12:03.