MEC01-01651
| Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 10:58:34. Contact: ###-####. seal return air, plumbing pipe penetrations and holes in the floor joist . 1/20/2002 2:13:20 PM
|
MEC01-01651
| Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 10:58:48. Contact: ###-####.
|
MEC00-04134
| Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 12:04:08. Contact: ###-####. pool heater 1/20/2002 11:16:51 AM
|
BLD01-01594
| BLD-Footing | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-01799
| Final | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-01339
| Final | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 16:00:26. Contact: ###-####.
|
BLD01-01566
| BLD-Footing | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 17:52:39. Contact: .
|
BLD00-03660
| BLD-Final | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 18:32:48. Contact: ###-####.
|
BLD01-01594
| BLD-Framing/Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD01-00588
| BLD-Footing | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | FAIL |
|
|
###-#### verbal c/n with contractor from wright brothers, front wall req 2 bars top and bottom also 6 in wider footing at the front entry also inst shear footings require a 6 in raise above the slab,also clearance to earth at several locations, not this is a mono pour for footing and slab. 1/20/2002 5:18:37 PM
|
BLD01-01333
| BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR NAIL ###-#### c/n posted. 1/20/2002 3:34:17 PM
|
BLD01-01182
| BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 08:55:01. Contact: ###-####. NO plans at the syte roof trusses only ok roof truss system ,c/n to provide plans. 1/20/2002 4:23:58 PM
|
MEC01-01793
| Pressure Test | 6/20/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | PASS |
|
|
reinspection Dean ###-#### please check fixture count for me
|
BLD00-02817
| BLD-Energy code compliance | 6/20/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | CANC |
|
|
John ###-####
|
BLD01-01566
| BLD-Footing | 1/20/2002 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 1/20/2002 3:19:06 PM had to add this in ,first entry incorrect, footings poured no plans on site.
|
BLD01-00999
| BLD-Wall cover | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 17:28:08. Contact: ###-####.
|
BLD01-00202
| BLD-Final | 6/19/2001 | 6/20/2001 | 6/20/2001 12:00:00 AM | P | FAIL |
|
|
###-#### c/n posted. 1/20/2002 6:54:15 PM
|