BLD02-01210
| BLD-Framing/Rough-in | 6/19/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | A | PART |
|
|
###-####; rec'd detail deleting upper portion of 1hr demising wall above lid 6/20/2002 9:53:36 AM
|
MIS02-00053
| BLD-Final | 6/19/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | A | NR |
|
|
Carl, let me know if this can be finaled. Thanks ~ called owner...still need verify elec final for perm occ. Owner will comply...keep c/n & t/o status until resolved. 6/20/2002 10:07:20 AM
|
BLD01-00234
| BLD-Conference | 6/19/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | A | NR |
|
|
wendel ###-#### need verify status w/ fire; keep c/n & temp status til resolved. 6/20/2002 11:22:08 AM
|
BLD01-00234
| BLD-Conference | 6/19/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | PART |
|
|
wendel ###-#### need to confirm fire insp status prior to perm occ... 6/24/2002 1:38:29 PM
|
MEC02-01638
| Rough-in | 6/20/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | PART |
|
|
RICH ###-####...c/n ok re flue termination, W.H. & connector not set, dbl fitting installed ok. 6/20/2002 1:30:33 PM
|
BLD02-00876
| BLD-Footing | 6/20/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | PART |
|
|
###-#### MIKE slab/frostwall ok to pour. 6/20/2002 3:31:05 PM
|
BLD02-00175
| BLD-Foundation | 6/20/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | PART |
|
|
ROBERT ###-####, steel ok, arch to advise re hd's & panel dimensions 6/20/2002 1:31:32 PM
|
MIS02-00097
| BLD-Final | 6/20/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | NR |
|
|
Cathy has the card - unfinished items noted have been completed - please confirm...unable to contact, left msg, will resched. 6/20/2002 3:30:26 PM
|
BLD02-01192
| BLD-Conference | 6/20/2002 | 6/20/2002 | 6/20/2002 12:00:00 AM | P | FAIL |
|
|
c/n issued to g.c...post address, misc framing issues
|