FIR03-00091
| FIR-Aging Inspection | 6/20/2005 | 6/20/2005 | 6/21/2005 3:13:34 PM | | DONE |
|
|
Spoke with Mike Bierman at Shilo in regards to this open permit, also called and left a message with Trent Bice. Mike is to follow up with an inspection request.
|
FIR05-00190
| INSP-Sprinkler Rough-in/Hydro | 6/20/2005 | 6/20/2005 | 6/20/2005 5:09:59 PM | P | FAIL |
|
|
Pendent heads are blocked by proximity to columns in womens lockers GS202, two heads are supplied by a 1" feed in womens GS203- see note #12 on plan review comments for requirements. Heads circled in red on approved plans are the only areas inspected at this time.
|
BLD04-01882
| FIRE-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 3:03:48 PM | P | FAIL |
|
|
Missing door hardware, need to test duct smoke detectors, exit discharge lighting not working, missing max occ. signs, need to test hood system which is not ready.
|
BLD04-01051
| BLD-Final | 6/20/2005 | 6/20/2005 | 6/20/2005 2:58:06 PM | P | FAIL |
|
|
Exit discharge lighting at three locations did not operate under emergency power, max occ. signs not installed, not all door hardware has been installed , still need to test duct smoke detectors and annunciators, hood suppresion system not ready to test.
|
FIR05-00282
| INSP-Sprinkler Rough-in/Hydro | 6/20/2005 | 6/20/2005 | 6/20/2005 1:00:24 PM | A | PART |
|
|
Overhead hydrostatic test passed inspection.
|
FIR04-00788
| INSP-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 12:58:55 PM | P | PASS |
|
|
Fire alarm finaled.
|
FIR05-00318
| INSP-Final Inspection | 6/17/2005 | 6/20/2005 | 6/20/2005 9:08:16 AM | A | FAIL |
|
|
Tested security doors on first floor. Unable to test doors on 2nd, 3rd, or 5th due to lack of locking function verification.
|
BLD04-00159
| FIRE-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|
BLD04-00313
| FIRE-Final Inspection | 6/20/2005 | 6/20/2005 | 6/20/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|
FIR05-00282
| INSP-Sprinkler Rough-in | 6/20/2005 | 6/20/2005 | 6/20/2005 12:00:00 AM | P | FAIL |
|
|
Verify correct size orfice on inspectors test, verify sammy screw size is listed for 2 1/2" pipe attatched vertically, overspaced longitudinal EQ brace, SSU above break room is too far below deck, provide as-builts for added head at entry and in accounting room, verify uprights after paint paper is removed, check L09 for blockage per. NFPA 8.6.5.1.2 at exposed beam- possibly not meeting density req. from L08.
|