Inspections for the day of: Tuesday, June 20, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-02018 Final6/20/20066/20/20066/20/2006 5:14:52 PMPPASS
thank you ; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
MEC06-02021 Final6/20/20066/20/20066/20/2006 5:13:14 PMPPASS
MEC06-02021 Pressure Test6/20/20066/20/20066/20/2006 5:12:43 PMPPASS
call donna with questions; Phone #: ###-#### x207 Internet Inspection Request from: Sickles Cassi
MEC06-01923 Pressure Test6/20/20066/20/20066/20/2006 5:11:59 PMPDONE
per dixie dallas- call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...leak
MEC06-01923 Rough-in6/20/20066/20/20066/20/2006 5:10:58 PMPFAIL
per dixie dallas- call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..run primary to outside wall and down to foundation..take the tape off the gastite
MEC06-01220 Rough-in6/20/20066/20/20066/20/2006 5:02:46 PMPPASS
###-####..jock decided to stay with basic installation which was ok
MEC06-00912 Final6/20/20066/20/20066/20/2006 2:29:00 PMPNH
karl - 2nd phase insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...i rescheduled this for wed am..i will do this the same time as your r/i on other floor..thanks dixie
MEC06-01155 Pressure Test6/20/20066/20/20066/20/2006 2:27:36 PMPNR
brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..called brandon to reschedule for wed am
MEC06-02012 Pressure Test6/20/20066/20/20066/20/2006 2:26:22 PMAFAIL
Added gas line to firepit, need pressure test Internet Inspection Request from: Wade Huskey..called wade and told him i wouldn't approve the gas until the trench was built up the full length to pit and all the debris ( wood, metal, iron stakes, et ) cleaned out..
MEC06-01995 Pressure Test6/19/20066/20/20066/20/2006 1:23:35 PMAPASS
steve - also call homeowner karen 1/2 hr prior to insp at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..this address should be 3128...
MEC06-01995 Rough-in6/19/20066/20/20066/20/2006 1:23:03 PMAPASS
steve - also call homeowner karen 1/2 hr prior to insp at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
MEC06-01725 Final6/15/20066/20/20066/20/2006 12:48:54 PMAFAIL
Please call Mark before going out. He will be home all day; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt...several corrections posted on furnace...leave notice on site
MEC06-01923 Rough-in6/19/20066/20/20066/20/2006 10:35:22 AMANR
dallas - call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...called dallas regarding btu's on equipment..told him to call builder and get exact loads on all equipment
MEC05-04253 Pressure Test6/19/20066/20/20066/20/2006 10:27:32 AMPCANC
RI & pressure test please, Chad is the contact; Phone #: ###-#### Internet Inspection Request from: Sheri Lilya Inspection cancelled from web by: Sheri Lilya
MEC06-02001 Rough-in6/19/20066/20/20066/20/2006 9:43:23 AMAPART
*0304 then 4th floor. dennis ###-#### Internet Inspection Request from: Andrea Creek..i will complete r/i when paige mech calls for their r/i...thanks dixie
MEC06-01456 Conference6/19/20066/20/20066/20/2006 9:20:28 AMAPART
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..spoke with alan..they took out all wood behind the hood and found it to be charred ( pictures ). once hat channel is installed and 5/8 rock put on, alan will call for a r/i and i will inspect it.