MEC06-02018
| Final | 6/20/2006 | 6/20/2006 | 6/20/2006 5:14:52 PM | P | PASS |
|
|
thank you ; Phone #: ###-#### Internet Inspection Request from: Becky Sucher
|
MEC06-02021
| Final | 6/20/2006 | 6/20/2006 | 6/20/2006 5:13:14 PM | P | PASS |
|
|
|
MEC06-02021
| Pressure Test | 6/20/2006 | 6/20/2006 | 6/20/2006 5:12:43 PM | P | PASS |
|
|
call donna with questions; Phone #: ###-#### x207 Internet Inspection Request from: Sickles Cassi
|
MEC06-01923
| Pressure Test | 6/20/2006 | 6/20/2006 | 6/20/2006 5:11:59 PM | P | DONE |
|
|
per dixie dallas- call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...leak
|
MEC06-01923
| Rough-in | 6/20/2006 | 6/20/2006 | 6/20/2006 5:10:58 PM | P | FAIL |
|
|
per dixie dallas- call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..run primary to outside wall and down to foundation..take the tape off the gastite
|
MEC06-01220
| Rough-in | 6/20/2006 | 6/20/2006 | 6/20/2006 5:02:46 PM | P | PASS |
|
|
###-####..jock decided to stay with basic installation which was ok
|
MEC06-00912
| Final | 6/20/2006 | 6/20/2006 | 6/20/2006 2:29:00 PM | P | NH |
|
|
karl - 2nd phase insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...i rescheduled this for wed am..i will do this the same time as your r/i on other floor..thanks dixie
|
MEC06-01155
| Pressure Test | 6/20/2006 | 6/20/2006 | 6/20/2006 2:27:36 PM | P | NR |
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..called brandon to reschedule for wed am
|
MEC06-02012
| Pressure Test | 6/20/2006 | 6/20/2006 | 6/20/2006 2:26:22 PM | A | FAIL |
|
|
Added gas line to firepit, need pressure test Internet Inspection Request from: Wade Huskey..called wade and told him i wouldn't approve the gas until the trench was built up the full length to pit and all the debris ( wood, metal, iron stakes, et ) cleaned out..
|
MEC06-01995
| Pressure Test | 6/19/2006 | 6/20/2006 | 6/20/2006 1:23:35 PM | A | PASS |
|
|
steve - also call homeowner karen 1/2 hr prior to insp at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..this address should be 3128...
|
MEC06-01995
| Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 1:23:03 PM | A | PASS |
|
|
steve - also call homeowner karen 1/2 hr prior to insp at ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
MEC06-01725
| Final | 6/15/2006 | 6/20/2006 | 6/20/2006 12:48:54 PM | A | FAIL |
|
|
Please call Mark before going out. He will be home all day; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt...several corrections posted on furnace...leave notice on site
|
MEC06-01923
| Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 10:35:22 AM | A | NR |
|
|
dallas - call prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley...called dallas regarding btu's on equipment..told him to call builder and get exact loads on all equipment
|
MEC05-04253
| Pressure Test | 6/19/2006 | 6/20/2006 | 6/20/2006 10:27:32 AM | P | CANC |
|
|
RI & pressure test please, Chad is the contact; Phone #: ###-#### Internet Inspection Request from: Sheri Lilya Inspection cancelled from web by: Sheri Lilya
|
MEC06-02001
| Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 9:43:23 AM | A | PART |
|
|
*0304 then 4th floor. dennis ###-#### Internet Inspection Request from: Andrea Creek..i will complete r/i when paige mech calls for their r/i...thanks dixie
|
MEC06-01456
| Conference | 6/19/2006 | 6/20/2006 | 6/20/2006 9:20:28 AM | A | PART |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..spoke with alan..they took out all wood behind the hood and found it to be charred ( pictures ). once hat channel is installed and 5/8 rock put on, alan will call for a r/i and i will inspect it.
|