FIR08-00151
| FIR-Aging Inspection | 6/20/2008 | 6/20/2008 | 6/20/2008 6:37:20 PM | | DONE |
|
|
wip
|
FIR07-00812
| INSP-Final Inspection | 6/20/2008 | 6/20/2008 | 6/20/2008 6:34:28 PM | P | PART |
|
|
UG flush and hydrostatic tests are complete.
|
FIR07-00935
| INSP-Sprinkler Rough-in/Hydro | 6/20/2008 | 6/20/2008 | 6/20/2008 6:32:29 PM | P | PART |
|
|
Verified some items per the C/N are finished including added heads at the wash bay, added seismic brace, spacing at the compressor room. Noted fire alarm work is nearly complete including tamper and flow switch wiring and FACP installation prior to the issuance of a fire alarm permit. Double permit fees will apply.
|
FIR06-00540
| INSP-Final Inspection | 6/19/2008 | 6/20/2008 | 6/20/2008 6:24:27 PM | A | PASS |
|
|
Verified items on correction notice for compliance, inspection passed, permit finaled.
|
FIR07-00415
| INSP-Alarm Testing | 6/20/2008 | 6/20/2008 | 6/20/2008 6:22:59 PM | P | CANC |
|
|
Wrong permit requested for inspection.
|
FIR08-00047
| INSP-Final Inspection | 6/19/2008 | 6/20/2008 | 6/20/2008 2:25:09 PM | A | PART |
|
|
New system fire alarm testing completed today including the FACP, NAC, RA, notification, initiation, dampers, HVAC controls and clean agent fire suppression panel interconnect. Elevator is not yet completed to enable functional testing of recall, shunt trip, SD's etc. Noted areas on the approved plan set in need of revision including one a/v to be added, adjust cd at one device, provide signage at the door to the FACP room per note #30, need as-built plans for documentation of moved EOL's and correct location for RTU's including clean agent monitoring, will test elevator controls when completed, mag locks at egress doors drop on FA with the exception of two doors not yet installed, dB at the womens and mens restrooms are possibly over max.110 allowed-will test at next site visit, map at the panel is acceptable.
|