Inspections for the day of: Wednesday, June 20, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00108 INSP-Sprinkler Rough-in6/19/20126/20/20126/20/2012 4:50:29 PMPPART
follow up inspection for second floor Phase 1; need approval for remainder to cover. Please call 1 hour before inspection-Scott Phone #: ###-#### >> Inspection requested via web by Scott Carter II *Okay to cover ceilings at the breakroom, conference room five, hall and permits desk areas.*
FIR11-00496 INSP-Sprinkler Rough-in/Hydro6/20/20126/20/20126/20/2012 4:32:57 PMPPART
Begin 24 hr. air test of the new dry system @44psi guage.
BLD12-01447 FIRE-Final Inspection6/20/20126/20/20126/20/2012 4:29:43 PMPPASS
Fire life safety inspection passed.
BLD10-02928 FIRE-Final Inspection6/20/20126/20/20126/20/2012 2:03:12 PMPFAIL
Door hardware and signage need revised as discussed.
BLD12-00413 FIRE-Final Inspection6/15/20126/20/20126/20/2012 2:00:45 PMPFAIL
Noted correction items to be finished prior to approval including door hardware, fire extinguishers, landings, storage at the mezzanine, signage, etc.
BLD12-01434 FIRE-Final Inspection6/20/20126/20/20126/20/2012 12:27:16 PMPPASS
Corrections completed with the exception of main door hardware repairs underway- to be finished prior to structural final.
BLD12-01450 FIRE-Final Inspection6/19/20126/20/20126/20/2012 12:13:03 PMAPASS
Fire life safety passed.
FIR12-00208 INSP-Final Inspection6/19/20126/20/20126/20/2012 11:52:28 AMAPASS
Scope of fire alarm work passed inspection. Two notification appliances adjusted while on site. Permit finaled.