Inspections for the day of: Thursday, June 20, 2013.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00037 INSP-Sprinkler Rough-in6/19/20136/20/20136/20/2013 5:00:12 PMPPART
Marked and dated locations on plans at the 1st and 2nd floor sheetrock lid areas including the mens and womens restrooms, kitchen and storage room okay for cover. Previous correction items at the basement including the painted upright and one missing head completed.
FIR13-00195 INSP-Final Inspection6/20/20136/20/20136/20/2013 3:51:31 PMPPASS
Scope of permit work completed. Final walkthrough passed.
FIR13-00262 INSP-Final Inspection6/20/20136/20/20136/20/2013 3:46:40 PMPPASS
Scope of demo work verified for completion. Permit finaled.
BLD13-01419 FIRE-Final Inspection6/19/20136/20/20136/20/2013 3:45:03 PMAFAIL
C/N items include; provide current certification tags on the fire extinguishers, post "door to remain ....." signage at the main entry/exit, remove manual thumbturn at the main entry/exit door.
FIR13-00247 INSP-Sprinkler Rough-in6/19/20136/20/20136/20/2013 3:41:33 PMAPART
Okay to cover remainder of overhead fire sprinkler work.
BLD12-03273 FIRE-Conference6/20/20136/20/20136/20/2013 3:40:22 PMADONE
Regarding cabinet and bracket heights for new and existing fire extinguishers.
FIR13-00224 INSP-Sprinkler Rough-in6/20/20136/20/20136/20/2013 3:37:49 PMAPART
Scope of work passed inspection- However, noted missing coverage at the south entry vestibule on the existing system. Final pending plan mod to include adding required heads.
FIR13-00116 INSP-Sprinkler Rough-in6/20/20136/20/20136/20/2013 3:34:12 PMAPART
Ref. stamped plans for locations above hard lids okayed for cover.
FIR13-00251 INSP-Sprinkler Rough-in6/20/20136/20/20136/20/2013 3:32:46 PMAPART
Overhead modifications approved for cover at the grid ceilings.