FIR13-00642
| INSP-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 4:46:44 PM | P | PART |
|
|
Verified 18ah batteries, points map has been provided- need to post as discussed, guard rail installed where horizontal projection exceeds IBC standard. 3rd floor damper tested- however opens on alarm, no access to test elevator tamper, plan modification to include DSC will be required prior to final.
|
FIR14-00350
| INSP-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 4:41:24 PM | P | PASS |
|
|
Demo permit approved for final.
|
BLD14-01048
| FIRE-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 2:51:37 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR14-00291
| INSP-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 12:19:32 PM | P | PASS |
|
|
Hood suppression permit approved for final status.
|
BLD14-00709
| FIRE-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 12:15:55 PM | A | PASS |
|
|
Fire life safety passed provided exit sign per key note #13 is installed, post 'watch step' sign per key note #15, mount PFE to the wall or column as discussed, designated walkway components to be provided once roofing repairs are finished.
|
FIR14-00332
| INSP-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 12:12:49 PM | A | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
FIR14-00331
| INSP-Final Inspection | 6/19/2014 | 6/20/2014 | 6/20/2014 12:11:54 PM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
BLD14-01124
| FIRE-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 11:02:30 AM | P | CANC |
|
|
Daryn Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIR14-00363
| INSP-Sprinkler Rough-in | 6/19/2014 | 6/20/2014 | 6/19/2014 2:06:39 PM | A | CANC |
|
|
This is an ug to cover. Bryan is the contact.Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|