ELE12-00913
| ELE-Aging Inspection | 6/20/2018 | 6/20/2018 | 6/22/2018 8:30:43 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE18-01121
| Final | 6/20/2018 | 6/20/2018 | 6/20/2018 1:49:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok final.
|
ELE18-02301
| Rough-In Permanent Service | 6/19/2018 | 6/20/2018 | 6/20/2018 1:02:07 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson p/s u/g n ok
|
ELE17-03951
| Electrical Rough-In | 6/19/2018 | 6/20/2018 | 6/20/2018 10:49:16 AM | A | PASS |
|
|
Contact: Clayton Pennington Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover interior and exterior walls in locations B and D.
|
ELE18-00887
| Final | 6/19/2018 | 6/20/2018 | 6/20/2018 10:48:35 AM | A | PASS |
|
|
Re-scheduled for 6/20/18. ###-#### Ok final.
|
ELE18-02080
| Electrical Rough-In | 6/20/2018 | 6/20/2018 | 6/20/2018 10:13:00 AM | A | PASS |
|
|
Frameing contractor should be there all day. Requesting an ok to cover Phone #: ###-#### Inspection requested via web by todd cline Ok cover kitch, utility, up bath. 2 gang junction box to be cut in cabinets on E wall, and also above refer will be 2 junction boxes that will be accessible.
|
ELE18-01804
| Permanent Service | 6/19/2018 | 6/20/2018 | 6/20/2018 8:56:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews p/s u/g n ok. Existing service was o/h, conduit ran and changed to underground.
|
MIS18-00236
| Set Bond Amount | 6/19/2018 | 6/20/2018 | 6/20/2018 8:20:00 AM | A | DONE |
|
|
Possible work done in upstairs portion for all trades. Used to be office space from what Im told, and now was converted into living space. There is no record of any permitting for any trades. Posted notice on front door of business at 8:20am on 6/20/18.
|
ELE17-03205
| Final | 6/19/2018 | 6/20/2018 | 6/19/2018 1:55:57 PM | A | PASS |
|
|
Ben Phone #: ###-#### Ok final. Corrections made. Outlet to right of range was installed under the cabinet. I didnt see it the first time. DW is cord and plug connected behind unit. Metioned to contractor that from now on recept needs to be adjacent to cabinet for readily accessible option. Spark ring and P-8 were installed above micro. Looked at job on 6/19/18.
|