Inspections for the day of: Friday, June 21, 1996.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE96-01555 INSP - Electrical Rough-In6/21/19966/21/19967/7/1996 12:00:00 AMPCANC
POTTY COMPOUND GAVE TO TOM
ELE96-01722 INSP - Conference6/21/19966/21/19966/21/1996 12:00:00 AM PASS
/ / 336 - P/S Ok
ELE96-01555 INSP - Electrical Rough-In6/21/19966/21/19966/21/1996 12:00:00 AM CANC
06/21/96 336 - POTTY COMPOUND gave to Joe
ELE95-01833 INSP - Final6/21/19966/21/19966/21/1996 12:00:00 AM CANC
06/21/96 336 - gave to Joe
ELE96-00749 INSP - Final6/21/19966/21/19966/21/1996 12:00:00 AM PASS
06/21/96 336 - PM FRIDAY Partial Final Ok
ELE96-01834 INSP - Electrical Rough-In6/21/19966/21/19966/21/1996 12:00:00 AM PASS
06/21/96 336 - REINSPECTION GET THERE BEFORE 4:30 BECAUSE THEY ARE GONE partial R/I Ok
ELE96-01949 INSP - Final6/21/19966/21/19966/21/1996 12:00:00 AM CANC
06/21/96 336 - REINSPECTION gave to Joe
ELE96-01980 INSP - Electrical Rough-In6/20/19966/21/19966/21/1996 12:00:00 AMAPASS
06/20/96 336 - R.I ON THE WALLS-NORTH TOWER 1ST FLOOR-$14,755.00-BLD96-0 FOR NEW ONCOLOGY ANNEX AS PER BOISE CITY APPENDED PLANS ROMAR JOB #96-02 Partial R/I ok
ELE95-00985 INSP - Final6/20/19966/21/19966/21/1996 12:00:00 AMAPASS
06/20/96 336 - final Ok
ELE96-00962 INSP - Electrical Rough-In6/20/19966/21/19966/21/1996 12:00:00 AMACANC
06/20/96 336 - Gave to Joe
ELE96-01722 INSP - Final6/20/19966/21/19966/21/1996 12:00:00 AMAFAIL
06/20/96 336 - Final Disapproved grounds not tied together no access to
ELE95-01833 INSP - Final6/21/19966/21/19966/21/1996 12:00:00 AMPPASS
final ok
ELE96-00749 INSP - Final6/20/19966/21/19966/21/1996 12:00:00 AMPCANC
06/20/96 336 - PM FRIDAY