ELE95-01222
| INSP - Conference | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | | PASS |
|
|
/ / 403 - discussed necessary method of wiring installation of ciruitry.
|
ELE95-01222
| INSP - Electrical Rough-In | 6/19/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | A | CANC |
|
|
06/20/96 403 - THIS IS A REINSPECTION. owner not sure of type of inspection needed at this time; not ready for ele r/i.
|
ELE96-00236
| INSP - Final | 6/19/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | A | PASS |
|
|
06/20/96 403 - 1 AND 2ND FLOORS AND THE ELEVATOR YOU NO WHATS HAPPENING YOU FINALED THE 1 AND 2ND FLOORS AND THE BASEMENT JUST THE ELEVATORS NEE BE LOOKED AT-DONT KNOW SORRY...elevator only phase left to final now. 40
|
ELE96-00344
| INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | P | CANC |
|
|
06/21/96 403 - sent to joe.
|
ELE96-01752
| INSP - Permanent service | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | P | PASS |
|
|
06/21/96 403 - LATE TODAY AS POSSIBLE service insp. only..403-m.b.
|
ELE96-01984
| INSP - Permanent service | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | P | PASS |
|
|
06/21/96 403 -
|
ELE96-01985
| INSP - T/S and Final | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | P | PASS |
|
|
06/21/96 403 -
|
ELE96-01987
| INSP - Air conditioning | 6/21/1996 | 6/21/1996 | 6/21/1996 12:00:00 AM | P | NH |
|
|
06/21/96 403 - left card.
|