Inspections for the day of: Monday, June 21, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-01347 INSP - Framing/Rough-in6/18/19996/21/19996/21/1999 12:00:00 AMAPASS
06/21/99 342 - Gib ###-####
BLD99-01391 INSP - Framing/Rough-in6/18/19996/21/19996/21/1999 12:00:00 AMAPASS
06/21/99 342 - ###-####//FRAMING CALL B4 GOING 2 MEET U 4 ACCESS
BLD99-01600 INSP - Foundation6/21/19996/21/19996/21/1999 12:00:00 AMPPASS
06/21/99 342 - Jeff ###-####
BLD99-01601 INSP - Foundation6/21/19996/21/19996/21/1999 12:00:00 AMPPASS
06/21/99 342 - Jeff ###-####
MIS99-00111 INSP - Conference6/21/19996/21/19996/21/1999 12:00:00 AMPFAIL
BLD98-03255 INSP - Final6/21/19996/21/19996/21/1999 12:00:00 AMPPASS
06/21/99 342 - Alias ###-#### call for access about 1/2 hr before c/c i
BLD99-00420 INSP - Foundation6/21/19996/21/19996/21/1999 12:00:00 AMPPASS
06/21/99 342 - BOB ###-#### FOOTING
BLD99-00897 INSP - Framing/Rough-in6/21/19996/21/19996/21/1999 12:00:00 AMPPART
06/21/99 342 - ###-####//FRAMING shr ok
BLD99-01030 INSP - Framing/Rough-in6/21/19996/21/19996/21/1999 12:00:00 AMPPASS
06/21/99 342 - ###-####
BLD99-01030 INSP - Energy code compliance6/21/19996/21/19996/21/1999 12:00:00 AMPPART
06/21/99 342 - ###-#### draft stops AT CEILING LINES NEEDED
BLD99-01321 INSP - Final6/21/19996/21/19996/21/1999 12:00:00 AMPFAIL
06/21/99 342 - Mike ###-#### need all signatures