Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00708 BLD-Aging Inspection6/21/20016/21/20016/21/2001 12:00:00 AM CANC
still valid 6/21/2001 8:38:16 AM
BLD01-01477 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2001 at 23:00:58. Contact: ###-####.
BLD01-00650 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2001 at 09:20:24. Contact: ###-####.pouring when I got here, looks ok so far, special inspector on job, pending report. 6/21/2001 11:09:01 AM
BLD01-00644 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2001 at 09:21:44. Contact: ###-####.
special inspector on site, ok pending report,, not set up all the way 6/21/2001 11:07:06 AM
BLD01-01609 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2001 at 10:58:07. Contact: ###-####. no forms in place yet, verbal warnings, t/w owner, ok to pour when ready 6/21/2001 11:25:34 AM
BLD01-01174 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2001 at 13:50:22. Contact: ###-####.
just setting forms, verbal warnings about proprty lines, etc. 6/21/2001 9:45:59 AM
BLD01-00187 BLD-Foundation6/20/20016/21/20016/21/2001 12:00:00 AMAPART
slab and vertical walls ###-####
pending s. i. report 6/21/2001 10:50:16 AM
BLD01-00846 BLD-Conference6/20/20016/21/20016/21/2001 12:00:00 AMAPASS
via phone, procedure, problem w/ property pin, etc 6/21/2001 10:46:18 AM
BLD98-01638 BLD-Final6/20/20016/21/20016/21/2001 12:00:00 AMAPASS
c of c can be issued 6/21/2001 3:30:55 PM
BLD01-01192 BLD-Framing/Rough-in6/20/20016/21/20016/21/2001 12:00:00 AMPPART
Jim ###-####
c/n on site 6/21/2001 1:13:59 PM
BLD01-01386 BLD-Footing6/20/20016/21/20016/21/2001 12:00:00 AMPNR
###-####
BLD01-01280 BLD-Energy code compliance6/20/20016/21/20016/21/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/20/2001 at 14:18:59. Contact: ###-####.
BLD00-01490 BLD-Framing/Rough-in6/21/20016/21/20016/21/2001 12:00:00 AMPPART
Chris ###-####
still need to see shear nailing and 2 hr connection w/ 1 hr wall, ok to cover unaffected areas 6/21/2001 1:29:09 PM
BLD00-01491 BLD-Framing/Rough-in6/21/20016/21/20016/21/2001 12:00:00 AMPPART
chris ###-####
need to see shear nailing and 2 hr wall 6/21/2001 1:24:00 PM
BLD01-00509 BLD-Conference6/21/20016/21/20016/21/2001 12:00:00 AMPPASS
check for comp. of bond for return ,bev ###-#### //////demo is done, new house excavation is done 6/21/2001 1:37:36 PM
BLD01-01484 BLD-Footing6/21/20016/21/20016/21/2001 12:00:00 AMPPART
Gary ###-####
BLD01-01043 BLD-Footing6/21/20016/21/20016/21/2001 12:00:00 AMPPASS
Added by Inspector: 415 On 6/21/2001 3:46:49 PM