Inspections for the day of: Friday, June 21, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00732 BLD-Foundation6/20/20026/21/20026/21/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2002 at 11:40:48. Contact: ###-####. slab & frost wall ok to pour. 6/21/2002 9:56:40 AM
BLD02-00731 BLD-Conference6/20/20026/21/20026/21/2002 12:00:00 AMAPASS
###-#### CALL FIRST need arch's detail to maintain 1hr corridors around core 6/21/2002 2:35:46 PM
BLD01-03156 BLD-Final6/20/20026/21/20026/21/2002 12:00:00 AMANR
###-#### ROB keep c/n 6/21/2002 3:12:21 PM
BLD02-00938 BLD-Framing/Rough-in6/20/20026/21/20026/21/2002 12:00:00 AMAPART
###-#### SCOTT c/n, firestop floors at plbg ,add gyp at perimeter chase per ch 8...ok to 1 side pend plbg/elec ok 6/21/2002 2:37:06 PM
MIS02-00097 BLD-Final6/20/20026/21/20026/21/2002 12:00:00 AMAPASS
###-#### LOUANNE
BLD02-00710 BLD-Foundation6/20/20026/21/20026/21/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/20/2002 at 16:50:47. Contact: ###-####. west & front portion of walls ok 6/21/2002 11:32:16 AM
BLD02-01210 BLD-Framing/Rough-in6/21/20026/21/20026/21/2002 12:00:00 AMPPART
###-#### RICHARD kickers installed, walls ok 6/24/2002 11:11:58 AM
BLD01-03156 BLD-Conference6/21/20026/21/20026/21/2002 12:00:00 AMPPASS
8414712 ;keep c/n...need eifs install certs per listing...weep screeds???6/21/2002 3:32:25 PM 6/21/2002 3:33:23 PM
BLD02-00731 BLD-Conference6/21/20026/21/20026/21/2002 12:00:00 AMPCANC
BLD02-00938 BLD-Framing/Rough-in6/21/20026/21/20026/21/2002 12:00:00 AMPNR
still need elec r/i ok to 1 side only 6/21/2002 2:38:12 PM