BLD02-00732
| BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/20/2002 at 11:40:48. Contact: ###-####. slab & frost wall ok to pour. 6/21/2002 9:56:40 AM
|
BLD02-00731
| BLD-Conference | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PASS |
|
|
###-#### CALL FIRST need arch's detail to maintain 1hr corridors around core 6/21/2002 2:35:46 PM
|
BLD01-03156
| BLD-Final | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | NR |
|
|
###-#### ROB keep c/n 6/21/2002 3:12:21 PM
|
BLD02-00938
| BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PART |
|
|
###-#### SCOTT c/n, firestop floors at plbg ,add gyp at perimeter chase per ch 8...ok to 1 side pend plbg/elec ok 6/21/2002 2:37:06 PM
|
MIS02-00097
| BLD-Final | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PASS |
|
|
###-#### LOUANNE
|
BLD02-00710
| BLD-Foundation | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/20/2002 at 16:50:47. Contact: ###-####. west & front portion of walls ok 6/21/2002 11:32:16 AM
|
BLD02-01210
| BLD-Framing/Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | PART |
|
|
###-#### RICHARD kickers installed, walls ok 6/24/2002 11:11:58 AM
|
BLD01-03156
| BLD-Conference | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | PASS |
|
|
8414712 ;keep c/n...need eifs install certs per listing...weep screeds???6/21/2002 3:32:25 PM 6/21/2002 3:33:23 PM
|
BLD02-00731
| BLD-Conference | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | CANC |
|
|
|
BLD02-00938
| BLD-Framing/Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | NR |
|
|
still need elec r/i ok to 1 side only 6/21/2002 2:38:12 PM
|