BLD02-00018
| BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PART |
|
|
###-####. ok to side, needs eaves at left and right sides sheetrocked as per plan. 6/21/2002 4:03:45 PM
|
BLD02-00897
| BLD-Final | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PASS |
|
|
ok perm oc. 6/21/2002 10:35:06 AM
|
BLD02-00972
| BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | FAIL |
|
|
TERRY ###-#### SHEER NAIL CALL 1-HOUR BEFORE SO TERRY CAN MEET YOU THERE .
|
BLD02-00637
| BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-01192
| BLD-Framing/Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | FAIL |
|
|
###-#### todd C/N posted by 407 and a pre inspection c/n posted by 340 , there is 2 on site. 6/21/2002 3:21:09 PM
|
BLD02-01194
| BLD-Framing/Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | FAIL |
|
|
###-#### todd sheer wall C/N posted. 6/21/2002 3:20:14 PM
|
BLD02-01188
| BLD-Framing/Rough-in | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 09:11:53. Contact: ###-####.ok to cover pending other trades.Ele and mec.Called contractor and notifed. 6/21/2002 4:29:22 PM 6/21/2002 4:33:13 PM
|
BLD01-01778
| BLD-Footing | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | PART |
|
|
JED ###-#### portion of basement. 6/21/2002 4:28:34 PM
|
BLD02-00972
| BLD-Conference | 6/21/2002 | 6/21/2002 | 6/21/2002 12:00:00 AM | P | PART |
|
|
went over plans for 2nd floor shear. 6/21/2002 4:29:04 PM
|