FIR03-00779
| INSP-Sprinkler Rough-in | 6/18/2004 | 6/21/2004 | 6/21/2004 12:00:00 AM | A | PART |
|
|
Sprinkler rough-in for first and second floor east side offices OK. See approved plans for specific locations. 6/21/2004 10:09:27 AM
|
FIR03-00448
| INSP-Final Inspection | 6/18/2004 | 6/21/2004 | 6/21/2004 12:00:00 AM | A | PASS |
|
|
All items on the correction notice corrected. 6/21/2004 1:24:20 PM
|
BLD03-03050
| FIRE-Final Inspection | 6/18/2004 | 6/21/2004 | 6/21/2004 12:00:00 AM | A | PASS |
|
|
Life safety finaled 6/21/2004 1:23:32 PM
|
BLD04-00016
| FIRE-Final Inspection | 6/18/2004 | 6/21/2004 | 6/21/2004 12:00:00 AM | A | FAIL |
|
|
No approved plans on site 6/21/2004 1:20:29 PM
|
BLD04-00220
| FIRE-Final Inspection | 6/21/2004 | 6/21/2004 | 6/21/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled 6/21/2004 3:44:55 PM
|