FIR05-00801
| FIR-Aging Inspection | 6/21/2006 | 6/21/2006 | 6/23/2006 2:01:25 PM | | NR |
|
|
Central tower work is in progress
|
FIR06-00058
| INSP-Final Inspection | 6/21/2006 | 6/21/2006 | 6/21/2006 5:24:44 PM | P | FAIL |
|
|
Provide separate point for the tamper and low air on the dry pipe valve. Need to verify all signals.
|
FIR06-00200
| INSP-Sprinkler Rough-in/Hydro | 6/20/2006 | 6/21/2006 | 6/21/2006 3:40:56 PM | A | PART |
|
|
Above ground hydro test passed but the forward flush failed.
|
BLD06-01172
| FIRE-Final Inspection | 6/20/2006 | 6/21/2006 | 6/21/2006 1:49:18 PM | A | FAIL |
|
|
Provide approved door hardware on all the exterior doors as per the door schedule. Remove the manual flush bolts from the inner double doors at the north end. Provide seven exit/emergency lights as marked on the approved plans and lower the two fire extinguishers.
|
FIR06-00327
| INSP-Sprinkler Rough-in/Hydro | 6/20/2006 | 6/21/2006 | 6/21/2006 1:30:06 PM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR06-00317
| INSP-Final Inspection | 6/20/2006 | 6/21/2006 | 6/21/2006 11:51:49 AM | A | FAIL |
|
|
Strobes are mounted too low and candella is wrong. See plans for locations.
|
FIR06-00194
| INSP-Final Inspection | 6/20/2006 | 6/21/2006 | 6/21/2006 11:51:08 AM | A | FAIL |
|
|
Need gas for the hvac units to verify shutdown and the nfpa 72 record of completion forms. All other items including signals passed.
|
BLD06-01380
| FIRE-Final Inspection | 6/20/2006 | 6/21/2006 | 6/21/2006 9:33:53 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00068
| INSP-Final Inspection | 6/20/2006 | 6/21/2006 | 6/21/2006 9:13:55 AM | A | FAIL |
|
|
Need to do forward flush, repair flow switch on the wet riser, provide inspection tags and hydraulic stickers on the dry riser. Also the review comments need verified for any other items that may be listed.
|
BLD05-02585
| FIRE-Final Inspection | 6/20/2006 | 6/21/2006 | 6/20/2006 3:33:15 PM | A | PASS |
|
|
life safety finaled
|