ESC05-01495
| Site Final | 6/21/2007 | 6/21/2007 | 6/21/2007 3:35:50 PM | P | FAIL |
|
|
Verbal to RP; Needs bare ground stablized.
|
ESC05-01474
| Site Final | 6/21/2007 | 6/21/2007 | 6/21/2007 3:35:19 PM | P | FAIL |
|
|
Lot of bare soil remains on site. Needs final stablization.
|
ESC07-00007
| Random Inspection | 6/21/2007 | 6/21/2007 | 6/21/2007 3:30:54 PM | P | PART |
|
|
Site looks good except no signage posted at entrance. Verbal to RP to post sign at entrance where it is visable.
|
ESC06-00386
| BMP Violation | 6/21/2007 | 6/21/2007 | 6/21/2007 2:25:04 PM | P | PART |
|
|
Verbal Correction to Melanie, (Environmental) regarding bare dirt pile. They will be hydroseeding ASAP. Comments included providing access controls at end of Elder and at curb cut out on south side of Elder. Will follow up.
|
ESC06-01832
| Site Preparation | 6/21/2007 | 6/21/2007 | 6/21/2007 2:03:38 PM | A | PART |
|
|
Verbal comments to Keil Ott at ###-####. Access controls and better bmp at brow of irragation canel.
|