Inspections for the day of: Tuesday, June 21, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-01362 BLD-Footing6/21/20116/21/20116/21/2011 4:49:02 PMPPASS
Aaron Phone #: ###-####. Footings for patio cover.
ESC11-00226 Random Inspection6/21/20116/21/20116/21/2011 3:25:22 PMPPASS
BLD11-00781 BLD-Foundation6/21/20116/21/20116/21/2011 3:25:09 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD11-00340 BLD-Final6/21/20116/21/20116/21/2011 2:54:53 PMPPASS
dennis - late afternoon please Phone #: ###-####. Ok for perm occ.
ESC11-00336 General Inspection6/21/20116/21/20116/21/2011 2:08:04 PMPPASS
BLD11-01204 BLD-Footing6/21/20116/21/20116/21/2011 2:07:49 PMPPART
Dane Phone #: ###-####
MIS11-00144 BLD-Conference6/21/20116/21/20116/21/2011 9:52:31 AMADONE
Tenant moving in, no bldg. permit. Boise fitness equipment is moving in. Only work being done is painting. Noted to tenant to submit floor plan to city for approval and get all required inspections to obtain a certificate of occupancy. A verbal corrction notice was given a this time to tenant. Tenant noted that she would contact hawkins smith for floor plan and submit to city this afternoon.
BLD11-00101 BLD-Conference6/20/20116/21/20116/21/2011 9:39:29 AMAPART
Grid inspection at south and west perimeter walls second floor. Phone #: ###-#### >> Inspection requested via web by alan fontenot. Remainder of clips have been installed, also ceiling grid ok for tile, 2nd flor, north of grid line e pending electrical and fire.
BLD11-01213 BLD-Footing6/20/20116/21/20116/21/2011 8:56:03 AMAPASS
ben Phone #: ###-####
ESC11-00339 Site Preparation6/21/20116/21/20116/21/2011 8:55:47 AMAPART
ESC permit sign is posted. Needs to provide sediment BMP's at perimeter of lot and provide drain inlet protection at storm drain. RP was notified via verbal correction notice. No concrete allowed until all deficiencies have been corrected.