BLD12-01294
| FIRE-Final Inspection | 6/21/2012 | 6/21/2012 | 6/22/2012 3:42:41 PM | P | FAIL |
|
|
The walls and ceiling system are still installed. Per Tim in plan review the approved plans, which are not on site, show all of these items to be removed. The space needs to match the plans or plan modifications need to be submitted showing these items to remain. I did test the smoke evac system which functioned correctly.
|
FIR12-00205
| INSP-Sprinkler Rough-in | 6/20/2012 | 6/21/2012 | 6/21/2012 2:34:58 PM | A | PASS |
|
|
Underground rough in inspection for the riser stub out is passed.
|
FIR12-00161
| INSP-Final Inspection | 6/20/2012 | 6/21/2012 | 6/21/2012 2:31:02 PM | A | FAIL |
|
|
Inspection turned into a conference. Tom and I walked the project and discussed the obstructions to the pendant sprinkler heads. Some heads have been relocated but other are still blocked by the light fixtures. There is also an issue with esch. on some of the dry sidewalls due to the rock facing not allowing the installation of the canopies.
|
BLD11-02842
| FIRE-Final Inspection | 6/20/2012 | 6/21/2012 | 6/21/2012 12:00:00 AM | A | CANC |
|
|
Max Phone #: ###-####
|