ESC15-00762
| General Inspection | 6/21/2017 | 6/21/2017 | 6/23/2017 11:24:21 AM | | CANC |
|
|
|
ESC16-01189
| General Inspection | 6/20/2017 | 6/21/2017 | 6/21/2017 1:16:25 PM | A | PASS |
|
|
No trackout to Emerald or Preece. Permit sign posted on Preece. Exits have had asphalt installed. No corrections issued at this time.
|
ESC17-00102
| Site Preparation | 6/21/2017 | 6/21/2017 | 6/21/2017 12:09:28 PM | P | PART |
|
|
WIP.
No site preparation inspection requested by contractor. No ESC permit sign or SWPPP info on site.
Silt fence perimeter is installed and construcction entrance at the north access point. RP Jerry is on site and water truck is in service to control dust during the grubbing & grading.
Note: - seperate contractor working on Suez waterline under future section of Bird Street.
Will follow up Friday 6/23 to post sign. No trackout or dust plumes leaving site at time of inspeciton.
|
ESC16-00719
| Aging Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 11:37:10 AM | | PASS |
|
|
No construction activity of disturbed area observed. No activity on BLD permit in 1 year. Permit expired. No further ESC inspections.
|
ESC16-00719
| DOC - Permit Finaled | 6/21/2017 | 6/21/2017 | 6/21/2017 11:36:15 AM | P | PASS |
|
|
|
ESC16-01356
| Site Final | 6/21/2017 | 6/21/2017 | 6/21/2017 11:30:31 AM | A | NR |
|
|
Work complete and stabilized.
Correction request to get ESC site final: - remove all temporary DI bags on Cable Car
|
ESC16-01345
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 10:55:01 AM | | PASS |
|
|
Billboard relocated. BLD finaled. No ESC corrections. Permit finaled.
|
ESC16-01345
| DOC - Permit Finaled | 6/21/2017 | 6/21/2017 | 6/21/2017 10:54:30 AM | P | PASS |
|
|
|
ESC17-00506
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 10:49:38 AM | A | PASS |
|
|
WIP. Project within vegetated and flat area. Stabilized access available. No trackout, dust or other issues.
|
ESC16-00218
| Aging Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 10:48:54 AM | | CANC |
|
|
rescheduled for site final
|
ESC17-00270
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 10:31:30 AM | P | PASS |
|
|
No trackout from site. Water truck onsite to control dust as necessary. DI bags installed.
Corrective action to trench in wattles on the south construction limit was completed. Work is occuring in this area currently. Need to sweep sidewalk once work in that area is complete.
|
ESC16-01729
| Random Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 10:06:14 AM | A | PASS |
|
|
WIP on excavation/grading for Victory Storage. MS4 on Victory has inlet protection. No activity at time of construction. NO trackout or discharges.
|
ESC16-00973
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 9:45:27 AM | | PASS |
|
|
No construction activity. Some areas of the RV sale lot are in use. Permanent onsite stormwater facilities installed. PWK and GRD permits are open and SWPPP and COB ESC permit posted. Will continue to monitor. No ESC violations observed.
|
ESC16-01403
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 9:39:11 AM | A | PASS |
|
|
Warehouse and loading areas are complete and stabilized. Frontage along Liberty is landscaped. No loose dirt or construction debris observed around site. No temporary BMPs installed. ESC permit conditions satisfied. BLD finaled.
|
ESC16-01403
| DOC - Permit Finaled | 6/21/2017 | 6/21/2017 | 6/21/2017 9:39:05 AM | P | PASS |
|
|
|
ESC15-00306
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 8:06:04 AM | | CANC |
|
|
|
ESC16-00056
| Aging Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 8:01:42 AM | | PASS |
|
|
Home complete, landscaped and occupied. No ESC corrections needed, all permits finaled.
|
ESC16-00056
| DOC - Permit Finaled | 6/21/2017 | 6/21/2017 | 6/21/2017 8:01:13 AM | P | PASS |
|
|
|
ESC16-00936
| General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 7:59:34 AM | | PASS |
|
|
WIP on retaining walls and foundation. No trackout or discharges to Skylark, trash is contained.
Silt fence at bottom of hill will be restored once walls are complete and the slope is regraded.
No corrections issued, site currently in compliance. Inspection 6/20. See also ESC16-00935 for adjacent project.
|
ESC16-00984
| Site Final | 6/13/2017 | 6/21/2017 | 6/20/2017 11:44:08 AM | A | PASS |
|
|
Work complet on apartment building in Aberdeen #5. Common areas landscaped, some units occupied. WIP on carports, all 4 building permits closed. See ESC16-00324 (GRD permit) and ESC17-00380 (carports) for remaining details. No discharges, trackout, dust issues, or construction trash violations observed.
|