ELE18-02337
| Final | 6/21/2018 | 6/21/2018 | 6/21/2018 3:04:20 PM | P | CANC |
|
|
underground for detached garage Phone #: ###-#### Inspection requested via web by Paula Gratiot Needed rough in inspection
|
ELE18-02336
| Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 3:02:14 PM | P | PASS |
|
|
Underground from house to garage. rough in ok cover
|
ELE18-02336
| Final | 6/21/2018 | 6/21/2018 | 6/21/2018 2:52:14 PM | P | PASS |
|
|
underground for garage Phone #: ###-#### Inspection requested via web by Paula Gratiot Rough in ok cover
|
ELE18-01206
| Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 2:09:36 PM | P | PART |
|
|
Please call Chris for wall R/I inspection on 3rd floor in area A. As close to 1230PM as possible please. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo As noted on contractor print rooms IT302, CO301, CO302, CO304, CO305, CO306, CO308, CO309, CO310, Wall rough in ok cover. Discussed all collaboration rooms as meeting rooms per 210.71 required receptacle outlets. Contractor to measure each meeting room and adjust for required receptacles.
|
ELE18-02318
| Rough-In Permanent Service | 6/20/2018 | 6/21/2018 | 6/21/2018 11:55:55 AM | A | PASS |
|
|
Bath rough in. Floor heat not done yet. Phone #: ###-#### Inspection requested via web by Barbara Szurgot 210.11- Bathroom receptacles shall be on a dedicated 20 amp circuit. Wiring has to be fished in. Called contractor who stated they were ok if allowed to cover and the 20 amp requirement will be checked at final. 2 bathrooms rough in ok cover
|
ELE18-02324
| Temporary Service | 6/20/2018 | 6/21/2018 | 6/21/2018 11:15:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Paula Gratiot t/s u/g n ok
|
ELE18-01012
| Final | 6/20/2018 | 6/21/2018 | 6/21/2018 10:53:29 AM | A | PASS |
|
|
garage code 9124 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE18-01013
| Final | 6/20/2018 | 6/21/2018 | 6/21/2018 10:53:04 AM | A | PASS |
|
|
garage code 9224 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE17-02862
| Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 10:28:40 AM | A | PART |
|
|
units 401 , 402 , 403 , 405 , 406 , 407 , 419 , 418 and 419 Phone #: ###-#### Inspection requested via web by Tom Betty 110.14(B)- All equipment grounding conductors shall be spliced for inspection at rough in inspection. Splicing shall be completed by using a listed connector. 405 and 406 switches, equipment grounds twisted together with no connector, receptacle locations just rolled in boxes. 401, 402, 403, 407, 417, 418, 419 only rough in ok cover
|
ELE17-03734
| Electrical Rough-In | 6/20/2018 | 6/21/2018 | 6/21/2018 9:46:58 AM | A | PASS |
|
|
Requesting partial rough for bar area Phone #: ###-#### Inspection requested via web by Clint Tate Bar 1/2 wall only rough in ok cover
|
ELE17-03734
| Electrical Rough-In | 6/21/2018 | 6/21/2018 | 6/21/2018 9:46:52 AM | P | FAIL |
|
|
Requesting partial rough for bar area Phone #: ###-#### Inspection requested via web by Clint Tate Panel wall. 110.26(E)(1)1a- Space equal to width and depth of equipment shall be dedicated electrical space and shall have no other systems in this space. below panels
|
ELE18-01770
| Final | 6/19/2018 | 6/21/2018 | 6/21/2018 8:21:29 AM | A | CANC |
|
|
Plans have been left on site in the meter box Phone #: ###-#### >> Inspection requested via web by Ashley White Inspection cancelled from web by: Ashley White
|