Inspections for the day of: Thursday, June 21, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02337 Final6/21/20186/21/20186/21/2018 3:04:20 PMPCANC
underground for detached garage Phone #: ###-#### Inspection requested via web by Paula Gratiot
Needed rough in inspection
ELE18-02336 Electrical Rough-In6/21/20186/21/20186/21/2018 3:02:14 PMPPASS
Underground from house to garage.
rough in ok cover
ELE18-02336 Final6/21/20186/21/20186/21/2018 2:52:14 PMPPASS
underground for garage Phone #: ###-#### Inspection requested via web by Paula Gratiot Rough in ok cover
ELE18-01206 Electrical Rough-In6/21/20186/21/20186/21/2018 2:09:36 PMPPART
Please call Chris for wall R/I inspection on 3rd floor in area A. As close to 1230PM as possible please. Thanks! Phone #: ###-#### Inspection requested via web by Rafael Castillo
As noted on contractor print rooms IT302, CO301, CO302, CO304, CO305, CO306, CO308, CO309, CO310, Wall rough in ok cover. Discussed all collaboration rooms as meeting rooms per 210.71 required receptacle outlets. Contractor to measure each meeting room and adjust for required receptacles.
ELE18-02318 Rough-In Permanent Service6/20/20186/21/20186/21/2018 11:55:55 AMAPASS
Bath rough in. Floor heat not done yet. Phone #: ###-#### Inspection requested via web by Barbara Szurgot
210.11- Bathroom receptacles shall be on a dedicated 20 amp circuit. Wiring has to be fished in. Called contractor who stated they were ok if allowed to cover and the 20 amp requirement will be checked at final.
2 bathrooms rough in ok cover
ELE18-02324 Temporary Service6/20/20186/21/20186/21/2018 11:15:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Paula Gratiot
t/s u/g n ok
ELE18-01012 Final6/20/20186/21/20186/21/2018 10:53:29 AMAPASS
garage code 9124 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
ELE18-01013 Final6/20/20186/21/20186/21/2018 10:53:04 AMAPASS
garage code 9224 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
ELE17-02862 Electrical Rough-In6/21/20186/21/20186/21/2018 10:28:40 AMAPART
units 401 , 402 , 403 , 405 , 406 , 407 , 419 , 418 and 419 Phone #: ###-#### Inspection requested via web by Tom Betty 110.14(B)- All equipment grounding conductors shall be spliced for inspection at rough in inspection. Splicing shall be completed by using a listed connector.
405 and 406 switches, equipment grounds twisted together with no connector, receptacle locations just rolled in boxes.
401, 402, 403, 407, 417, 418, 419 only rough in ok cover
ELE17-03734 Electrical Rough-In6/20/20186/21/20186/21/2018 9:46:58 AMAPASS
Requesting partial rough for bar area Phone #: ###-#### Inspection requested via web by Clint Tate
Bar 1/2 wall only rough in ok cover
ELE17-03734 Electrical Rough-In6/21/20186/21/20186/21/2018 9:46:52 AMPFAIL
Requesting partial rough for bar area Phone #: ###-#### Inspection requested via web by Clint Tate
Panel wall. 110.26(E)(1)1a- Space equal to width and depth of equipment shall be dedicated electrical space and shall have no other systems in this space. below panels
ELE18-01770 Final6/19/20186/21/20186/21/2018 8:21:29 AMACANC
Plans have been left on site in the meter box Phone #: ###-#### >> Inspection requested via web by Ashley White Inspection cancelled from web by: Ashley White