ELE19-02243
| Rough-In Permanent Service | 6/20/2019 | 6/21/2019 | 6/21/2019 2:57:55 PM | A | PASS |
|
|
It will be open. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s u/g rec ok
|
ELE19-02066
| Permanent Service | 6/17/2019 | 6/21/2019 | 6/21/2019 1:54:19 PM | P | PASS |
|
|
Please call Andrew with any question at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s o/h n ok
|
ELE19-02260
| Permanent Service | 6/21/2019 | 6/21/2019 | 6/21/2019 1:16:41 PM | P | PASS |
|
|
Overhead service on the shop. Phone #: ###-#### Inspection requested via web by Greg Idsinga p/s o/h n ok
|
ELE19-02304
| Temporary Service | 6/21/2019 | 6/21/2019 | 6/21/2019 12:48:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Heath Thomas t/s u/g n ok
|
ELE19-02225
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:08:15 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02228
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:07:57 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02212
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:07:39 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02226
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:07:23 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02229
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:07:06 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02230
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:06:17 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02227
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:06:01 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS t/s u/g n ok
|
ELE19-02211
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 12:05:31 PM | P | PASS |
|
|
Inspection requested via web by ERIC CENTERS Better dust those tools off. You have a lot of work to do! t/s u/g n ok
|
ELE19-02245
| Electrical Rough-In | 6/20/2019 | 6/21/2019 | 6/21/2019 11:31:45 AM | A | PASS |
|
|
Please call Nick Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover outside wall on bathrooms. Entrance area break room, center room, and all rooms on N side.
|
ELE19-01343
| Final | 6/20/2019 | 6/21/2019 | 6/21/2019 10:43:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final. During the RI stage on properties 2101, 2103, 2107, and 2113 power was run from the detached garage to the sides of the homes. Fused power entered a 12x12 pvc junction box. No disc. I realize 225.32 states that a disc means needs to be provided. This was something that I misinterpreted. There is a main brkr at the service location for the panels that are installed in the homes. All terminations, fittings and boxes follow NEC requirements. Junction boxes on 2 of the structures are located directly below 3 large dining windows. Would be hard to move. The other 2 would lack a majority of the working clearance needed. These are the only 4 structures that I have inspected that have this type of installation. I did let the contractor and builder know that for future work like this, 225.32 would need to be followed. There is No life safety issues with this installation.
|
ELE19-02235
| Electrical Rough-In | 6/18/2019 | 6/21/2019 | 6/21/2019 10:17:29 AM | A | PASS |
|
|
Rough-In inspection for stage area. Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover stage area. Multiple drops in floor to be pulled up once floor is done. Floor boxes will be installed.
|
ELE19-02043
| Permanent Service | 6/20/2019 | 6/21/2019 | 6/21/2019 10:03:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson On a few occasions I have allowed energize service for locations with a slight difference of depth for working clearance. A fence was needed to divide the properties. If they moved the fence to allow for maximum working clearance, the service would now be on the outside of the fence, and accessible to the public from the alley way. Homeowners would not have a readily accessible opportunity to their breakers. p/s o/h n ok
|
ELE18-04477
| Electrical Rough-In | 6/20/2019 | 6/21/2019 | 6/21/2019 9:43:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover hardlids in 6 bathrooms.
|
ELE19-02276
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/21/2019 9:28:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE19-01065
| Final | 6/20/2019 | 6/21/2019 | 6/21/2019 8:39:29 AM | A | NR |
|
|
There will be someone home. If you have any questions please feel free to contact Darren ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan
|
ELE16-02437
| ELE-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 6:19:13 AM | | DONE |
|
|
Extension was given by Daryl DeGrange on 3/22/19
|
ELE19-02215
| Temporary Service | 6/20/2019 | 6/21/2019 | 6/20/2019 3:50:56 PM | P | CANC |
|
|
>> Inspection requested via web by ERIC CENTERS Inspection cancelled from web by: ERIC CENTERS
|