Inspections for the day of: Thursday, June 22, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02111 Rough-in6/21/20006/22/20006/22/2000 12:00:00 AMAPASS
###-####
MEC00-02111 Pressure Test6/21/20006/22/20006/22/2000 12:00:00 AMAPASS
MEC00-02074 Final6/21/20006/22/20006/22/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/21/2000 at 09:50:22. Contact: ###-####.
BLD99-03390 BLD-Final6/21/20006/22/20006/22/2000 12:00:00 AMACANC
call perry ###-#### before going out By contractors request. 6/22/00 11:20:47 AM
BLD00-01466 BLD-Framing/Rough-in6/21/20006/22/20006/22/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/21/2000 at 18:57:05. Contact: ###-####.
BLD00-01200 BLD-Framing/Rough-in6/22/20006/22/20006/22/2000 12:00:00 AMPFAIL
John ###-#### c/N posted 6/23/00 11:21:22 AM
BLD00-00767 BLD-Energy code compliance6/22/20006/22/20006/22/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/22/2000 at 08:41:25. Contact: .
MEC00-00156 Final6/22/20006/22/20006/22/2000 12:00:00 AMPFAIL
###-#### C/N poste 6/23/00 11:21:07 AM
BLD00-00772 BLD-Framing/Rough-in6/22/20006/22/20006/22/2000 12:00:00 AMPPASS
###-####
BLD00-01127 BLD-Other6/20/20006/22/20006/22/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/20/2000 at 08:03:53. Contact: .
BLD00-01062 BLD-Framing/Rough-in6/21/20006/22/20006/22/2000 12:00:00 AMPFAIL
SHEAR WALL INSP--NICK ###-####
MEC00-01893 Final6/21/20006/22/20006/21/2000 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 06/21/2000 at 13:54:31. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/21/2000 at 17:14:50.