MEC00-02022
| Rough-in | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 13:30:31. Contact: ###-####.
|
MEC00-02022
| Pressure Test | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 13:31:02. Contact: ###-####.
|
MEC00-02119
| Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
a/c only ###-####
|
MEC00-02120
| Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
a/c only ###-####
|
MEC00-02121
| Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
a/c only ###-####
|
MIS00-00145
| BLD-Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | CANC |
|
|
COMB. ON DOOR PCH ENTER H-code already been done. 6/22/00 2:11:09 PM
|
BLD00-00325
| BLD-Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | PASS |
|
|
###-#### L/C issued 6/22/00 2:15:17 PM
|
MIS00-00164
| BLD-Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | A | FAIL |
|
|
SCOTT STEWART ###-#### SHEILA No one at site. 6/22/00 2:11:37 PM
|
BLD00-00829
| BLD-Foundation | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 13:03:35. Contact: ###-####. all but drive thru area 6/23/00 11:22:38 AM
|
BLD00-01274
| BLD-Energy code compliance | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PASS |
|
|
mike-----###-#### energy code R-19 floor required. 6/23/00 11:22:21 AM
|
BLD00-01011
| BLD-Final | 6/21/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok after verify elec. final 6/23/00 11:21:44 AM
|
MEC00-01619
| Final | 6/22/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | FAIL |
|
|
Daryl ###-#### late pm Not ready 6/23/00 11:22:44 AM
|
MEC00-01659
| Final | 6/22/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 09:25:11. Contact: ###-####.
|
MEC00-02039
| Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 10:25:56. Contact: ###-####.
|
MEC00-02039
| Pressure Test | 6/22/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 10:26:28. Contact: ###-####.
|
BLD00-01633
| BLD-Footing | 6/22/2000 | 6/22/2000 | 6/22/2000 12:00:00 AM | P | PART |
|
|
Kevin ###-#### late pm Incomplete 6/23/00 11:22:11 AM
|