PLM01-02064
| Sprinkler (Final) | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-02067
| Sprinkler (Final) | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-02033
| Water and/or Sewer | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 6/21/2001 5:12:36 PM sewer phase 2 loggers pond, cascade pipeline corp, ###-####they are still having problems with other utilities in the way and damage repair. They will reschedule. 6/22/2001 11:47:22 AM
|
PLM01-00342
| Plumbing Rough-in | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 14:01:26. Contact: ###-####.
|