Inspections for the day of: Friday, June 22, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02062 BLD-Foundation6/21/20016/22/20016/22/2001 12:00:00 AMAPART
###-#### masonry cols ok to continue 6/22/2001 11:36:08 AM
BLD00-02375 BLD-Concrete6/21/20016/22/20016/22/2001 12:00:00 AMAPART
Wendel ###-####; ok pend Spec insp report. 6/25/2001 9:24:30 AM
BLD00-03662 BLD-Footing6/21/20016/22/20016/22/2001 12:00:00 AMAPART
Richard Lawson ###-####; work looks ok....p.l.?? told contractor to consult owner re verification or survey 6/22/2001 11:41:14 AM
BLD01-00525 BLD-Other6/22/20016/22/20016/22/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/22/2001 at 07:27:07. Contact: ###-####. need wires pods, firecaulk corridor 6/22/2001 12:11:11 PM
BLD01-00603 BLD-Foundation6/21/20016/22/20016/22/2001 12:00:00 AMAPART
###-#### ret walls , 6/25/2001 9:27:35 AM
BLD01-00186 BLD-Footing6/21/20016/22/20016/22/2001 12:00:00 AMAPART
Robert ###-####; perim ftgs; ok pend MTI report. met w/ super onsite 6/22/2001 11:31:50 AM
BLD99-03148 BLD-Conference6/22/20016/22/20016/22/2001 12:00:00 AMAPART
Added by Inspector: 340 On 6/22/2001 8:48:46 AM w/ bldr re c/n & Rick J. re fire issues...grease duct/chimney
BLD01-00001 BLD-Conference6/22/20016/22/20016/22/2001 12:00:00 AMAPART
Added by Inspector: 340 On 6/22/2001 10:31:42 AM w/ framer re verbal c/n...2hr walls
BLD01-00186 BLD-Conference6/22/20016/22/20016/22/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 6/22/2001 11:35:33 AM met w/ bldr onsite, surgery suite project, pre-con partial
BLD01-00001 BLD-Conference6/22/20016/22/20016/22/2001 12:00:00 AMAPART
Scheduled by Inspector: 340 On 6/22/2001 4:26:43 PM
BLD01-00603 BLD-Footing6/22/20016/22/20016/22/2001 12:00:00 AMPPART
Added by Inspector: 340 On 6/22/2001 1:33:41 PM perim ok
BLD01-01124 BLD-Framing/Rough-in6/22/20016/22/20016/22/2001 12:00:00 AMPFAIL
shear Cameron ###-####; need stud for sthd's by windows at rear...fix & recall 6/22/2001 2:41:08 PM
BLD01-00379 BLD-Foundation6/21/20016/22/20016/22/2001 12:00:00 AMPPART
Chris ###-####, spec. insp onsite; walls 6/22/2001 4:25:51 PM
BLD01-00262 BLD-Final6/22/20016/22/20016/22/2001 12:00:00 AMPPASS
###-#### card to contractor 6/22/2001 2:10:00 PM