ELE01-02077
| Electrical Rough-In | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | A | PASS |
|
|
early am Mark pager ###-####. 1st floor, lobby; concierge desk r/i; ok. 6/22/2001 8:54:50 AM
|
ELE01-01769
| Permanent Service | 6/21/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | A | PASS |
|
|
Paul ###-####. changed service entrance conductors from overhead to underground ok.
p/s ug r a-ok ele #1769
idaho power will pull in service entrance conductors and make connection to meter. 6/22/2001 9:28:35 AM
|
ELE01-02064
| Rough-In Permanent Service | 6/22/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 07:35:43. Contact: ###-####. r/i; perm/svc ok.
p/s ug n better homes ele #2064 6/22/2001 12:07:28 PM
|
ELE01-02098
| Temporary Service | 6/22/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | P | PASS |
|
|
###-####. temporary power pole. ok.
t/s ug s k ele #2098
(pole at end of driveway) 6/22/2001 10:47:44 AM
|
ELE01-01575
| Final | 6/22/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 08:47:03. Contact: ###-####. temporary occupancy; only for tenant to move-in. not for general public occupancy. 6/22/2001 4:15:15 PM
|
ELE01-01985
| Final | 6/22/2001 | 6/22/2001 | 6/22/2001 12:00:00 AM | P | PART |
|
|
mike ###-#### please call before you go out.
perm/svc; connect for power only. ok
p/s oh r mike sewell #1985 6/22/2001 2:15:02 PM
|
ELE01-02079
| Temporary Service | 6/21/2001 | 6/22/2001 | 6/21/2001 12:00:00 AM | A | CANC |
|
|
bbob ###-#### contractor wanted inspection canceled.
|