Inspections for the day of: Thursday, June 22, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00836 FIR-Aging Inspection6/22/20066/22/20066/23/2006 2:00:36 PM NR
Central tower work is in progress
FIR06-00402 INSP-Final Inspection6/22/20066/22/20066/22/2006 3:54:54 PMPPASS
Permit finaled
BLD05-03201 FIRE-Final Inspection6/22/20066/22/20066/22/2006 3:54:10 PMPPASS
Life safety finaled
FIR05-00693 INSP-Sprinkler Rough-in6/22/20066/22/20066/22/2006 3:53:28 PMPPASS
The single sprinkler pendant in the east first floor entry lobby is ok to cover.
FIR05-00536 INSP-Sprinkler Rough-in6/22/20066/22/20066/22/2006 3:52:16 PMPPASS
west half of the 2nd floor rough-in is passed. Inspection for arm-overs will need to be done.
FIR06-00120 INSP-Sprinkler Rough-in/Hydro6/22/20066/22/20066/22/2006 1:47:09 PMPPASS
permit finaled
FIR05-00788 INSP-Final Inspection6/22/20066/22/20066/22/2006 1:46:27 PMPPASS
permit finaled
FIR05-00788 INSP-Final Inspection6/22/20066/22/20066/22/2006 12:22:03 PMPPASS
Permit finaled
FIR05-00788 FIR-Aging Inspection6/22/20066/22/20066/22/2006 12:21:47 PMPPASS
Permit finaled
FIR06-00058 INSP-Final Inspection6/21/20066/22/20066/22/2006 12:20:32 PMPFAIL
The supervisory signals that were sent out were received as fire alarm signals.
BLD05-01735 FIRE-Conference6/21/20066/22/20066/22/2006 12:17:03 PMPDONE
I went over the life safety comments with the contractor
BLD05-01661 FIRE-Conference6/21/20066/22/20066/22/2006 12:16:47 PMPDONE
I went over the life safety comments with the contractor
FIR06-00068 INSP-Final Inspection6/21/20066/22/20066/22/2006 11:11:45 AMAPASS
Permit finaled
FIR06-00200 INSP-Final Inspection6/21/20066/22/20066/22/2006 8:43:41 AMAPASS
Permit finaled.