Inspections for the day of: Friday, June 22, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-03276 Final6/21/20076/22/20076/22/2007 8:08:56 PMAPASS
contact Rick McDougnal for access Phone #: ###-#### Internet Inspection Request from: Roger Patterson
MEC07-02097 Pressure Test6/22/20076/22/20076/22/2007 3:54:48 PMPPASS
nicole; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang..20lb gas ok
MEC07-02097 Rough-in6/22/20076/22/20076/22/2007 3:54:24 PMPNR
nicole; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
MEC07-02096 Pressure Test6/22/20076/22/20076/22/2007 3:53:51 PMPPASS
nicole ; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang..20lb gas ok
MEC07-02096 Rough-in6/22/20076/22/20076/22/2007 3:53:22 PMPPASS
nicole ; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
MEC07-00870 Final6/22/20076/22/20076/22/2007 3:08:42 PMPPASS
For Entrance: Call Jim at ###-#### Phone #: ###-#### Internet Inspection Request from: bryan taylor
MEC07-02190 Final6/21/20076/22/20076/22/2007 3:07:51 PMAPASS
Please inspect as late in the morning as possible. Call with any problems. Thanks, April.
Phone #: ###-#### Internet Inspection Request from: April Sims
MEC07-02170 Conference6/21/20076/22/20076/22/2007 3:05:42 PMAPASS
wayne Phone #: ###-####..met with wayne to discuss corrections..he will call lee and talk to him about the duct work...air connector used not flex duct
MEC07-01721 Rough-in6/22/20076/22/20076/22/2007 3:03:49 PMPPASS
request pass on pending as attic insulation shield was added at rough-in. Call rick lake to verify...###-####

Call 30-45 minutes ahead to: Supervisor (LArry ###-####) for access into home "before" inspection. Thank you. Phone #: ###-#### Internet Inspection Request from: Mike Almanza
MEC07-01492 Final6/22/20076/22/20076/22/2007 3:03:28 PMPPASS
###-####
MEC07-01721 Final6/22/20076/22/20076/22/2007 3:02:53 PMPPASS
request final inspection(s) on both fireplaces.

Call 30-45 minutes ahead to: Supervisor (LArry ###-####) for access into home "before" inspection. Thank you. Phone #: ###-#### Internet Inspection Request from: Mike Almanza
MEC07-00914 Final6/21/20076/22/20076/22/2007 12:57:02 PMAPASS
meet chad after his meeting ###-####
MEC07-00742 Final6/22/20076/22/20076/22/2007 10:55:08 AMPPART
Please call Scott with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel...put 60lb gas test tag on meter
MEC07-01136 Rough-in6/21/20076/22/20076/22/2007 10:34:35 AMAFAIL
rough/cover Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen...venting length on 2 w/h exceed the manufacturer allowance..i called sarah in the technical dept and spoke with her
MEC05-02984 Final6/22/20076/22/20076/22/2007 12:00:00 AMPDONE
scheduled per dixie's request