Inspections for the day of: Friday, June 22, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00528 INSP-Sprinkler Rough-in6/22/20076/22/20076/26/2007 1:08:27 PMPCANC
This is a duplicate inspection.
FIR07-00378 INSP-Final Inspection6/21/20076/22/20076/22/2007 2:58:27 PMPPASS
permit finaled
BLD05-03359 FIRE-Final Inspection6/21/20076/22/20076/22/2007 12:34:47 PMAPART
A temporary occupamcy was given with dave hannimans permission. The items that need to be completed are the prep booth. Its interlocks and electrical wiring within 5'/3' needs to be addressed when installed. A written notice was given to the building contractor stating the prep booth is not to be used for its intended purpose or for storage. The air outlets are to be plugged. The intelocks on the paint booth operated per IFC chapter 15 and is approved for used as far as my signoff.
FIR07-00426 INSP-Sprinkler Rough-in6/21/20076/22/20076/22/2007 11:07:41 AMAPASS
Sprinkler piping is ok to cover
FIR07-00496 INSP-Sprinkler Rough-in6/21/20076/22/20076/22/2007 11:05:23 AMAPASS
Sprinkler piping is ok to cover
FIR07-00523 INSP-Final Inspection6/21/20076/22/20076/22/2007 10:59:17 AMAPASS
The hood suppression system operated correctly. The air balance is at .025 in the negative and is ok. Two hood are installed with separate manual activation. I found that the hood have been connected to the fire alarm panel prior to having approved drawings. I notified Mike Timmerman. Bar Green is going to install an "eye brow" on the hood since vertical and horizontal distances exceed what is allowed per IMC chapter 507. This will be verified at the building final.
FIR07-00492 INSP-Alarm Testing6/21/20076/22/20076/21/2007 1:01:39 PMACANC
randy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang Inspection cancelled from web by: Patricia Smith