Inspections for the day of: Wednesday, June 22, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00654 BLD-Final6/22/20116/22/20116/22/2011 4:35:05 PMPPASS
Perry please call 1/2 hr prior
BLD11-00654 DOC - Permit Finaled6/22/20116/22/20116/22/2011 4:34:55 PMPPASS
BLD11-01103 BLD-Framing/Rough-in6/22/20116/22/20116/22/2011 4:34:30 PMPPASS
brad Phone #: ###-####
Frame and energy OK
BLD11-01403 BLD-Conference6/21/20116/22/20116/22/2011 4:33:02 PMPPASS
>> Inspection requested via web by William Morriss
BLD11-01403 DOC - Permit Finaled6/22/20116/22/20116/22/2011 4:32:44 PMPPASS
BLD11-01190 BLD-Footing6/22/20116/22/20116/22/2011 4:32:01 PMPPASS
Shane Phone #: ###-####
ESC11-00332 Site Preparation6/22/20116/22/20116/22/2011 1:34:47 PMPFAIL
Alan phone......Talked to Alan Need sign and wash out prior to pouring any concrete.
MIS11-00145 BLD-Conference6/21/20116/22/20116/22/2011 1:07:43 PMAPEND
Homeowner doing work on roof and deck......he needs to get permits. I talked to him.....he said he would.
BLD11-00049 BLD-Conference6/21/20116/22/20116/22/2011 1:04:26 PMACANC
>> Inspection requested via web by William Morriss
Re-sched....for Thurs AM.
MIS11-00149 BLD-Conference6/22/20116/22/20116/22/2011 1:02:13 PMAPASS
roofing without a permit
About the same time I was filling out stop work order, the Contractor was calling in for the permit. He beat me by 10 min.
MIS11-00149 DOC - Permit Finaled6/22/20116/22/20116/22/2011 1:00:00 PMPPASS
BLD11-01204 BLD-Foundation6/21/20116/22/20116/22/2011 11:30:02 AMAPASS
Dane Phone #: ###-####
BLD11-00654 DOC - Permit Finaled6/22/20116/22/20116/22/2011 10:52:15 AMPPASS