BLD12-00383
| FIRE-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 3:54:54 PM | P | FAIL |
|
|
No approved plans on site or the small documents. So no real inspection was performed. I did however test the emergency stop system which functioned correctly.
|
FIR11-00543
| INSP-Sprinkler Rough-in | 6/21/2012 | 6/22/2012 | 6/22/2012 3:04:45 PM | A | PART |
|
|
Corrections in in the attic have been addressed except for the SD heads are too far from the peak as shown measured on the data sheet.
|
FIR12-00285
| INSP-Sprinkler Rough-in | 6/22/2012 | 6/22/2012 | 6/22/2012 3:01:34 PM | P | PASS |
|
|
Rough-in passed. Piping placement, on the plans, does not necessarily match the actual installation. Piping needs to be hydro tested. Also per the plans the temp. and responce needs to match on all heads which it does not. There are 165 heads installed at the south/front of the project. The rest of the heads are 200 degree.
|
BLD12-00345
| FIRE-Conference | 6/22/2012 | 6/22/2012 | 6/22/2012 2:56:38 PM | P | DONE |
|
|
The project super intendant and I went over fire extinguishers and exit signs.
|
BLD11-02842
| FIRE-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 2:55:51 PM | P | PASS |
|
|
life safety passed
|
BLD12-00827
| FIRE-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 1:35:01 PM | A | FAIL |
|
|
Mount the fire extinguisher as discussed and provide single action hardware on the doors as discussed. The exit signs and emergency lights functioned.
|
BLD12-00821
| FIRE-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 12:57:00 PM | A | PASS |
|
|
life safety passed. The owner was going to leave and get the annual inspection on the fire extinguisher taken care of.
|
FIR11-00543
| INSP-Supply line flush | 6/21/2012 | 6/22/2012 | 6/22/2012 11:27:08 AM | A | PASS |
|
|
The underground supply line flush passed
|
FIR12-00238
| INSP-Final Inspection | 6/20/2012 | 6/22/2012 | 6/22/2012 11:24:48 AM | A | PASS |
|
|
Permit finaled
|
BLD11-03041
| FIRE-Conference | 6/22/2012 | 6/22/2012 | 6/22/2012 11:23:54 AM | P | DONE |
|
|
I went over the outstanding life safety corrections with Cheryl, a walmart manager.
|
FIR12-00185
| INSP-Final Inspection | 6/21/2012 | 6/22/2012 | 6/22/2012 9:25:52 AM | P | PASS |
|
|
Permit finaled
|
FIR12-00151
| INSP-Conference | 6/19/2012 | 6/22/2012 | 6/22/2012 8:40:48 AM | A | DONE |
|
|
Brian Anderson and I went over the fire alarm plans. Per redlined drawings as-builts are required due to the notification circuit. Some addressing has changed, NAC panel location has changed, the function of some modules has changed. Also per conversation with the fire alarm plan reviewer resubmittals are going to be required since the fire alarm permit scope of work does not match the building plans scope of work. Brian was going to check with his office on this.
|
BLD12-00248
| FIRE-Final Inspection | 6/20/2012 | 6/22/2012 | 6/22/2012 7:41:51 AM | A | PASS |
|
|
Life safety passed
|