Inspections for the day of: Monday, June 22, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00757 FIR-Aging Inspection6/22/20156/22/20156/23/2015 7:01:43 AM NH
Contractor is out of business
FIR15-00308 INSP-Final Inspection6/22/20156/22/20156/22/2015 2:52:39 PMPFAIL
Need one head relocated or plugged now that the temp wall has been removed.
BLD15-01100 FIRE-Final Inspection6/21/20156/22/20156/22/2015 1:58:46 PMAFAIL
Life safety will be ok to final when the project related fire sprinkler permit is finaled
FIR14-00770 INSP-Sprinkler Rough-in6/22/20156/22/20156/22/2015 1:44:25 PMPPASS
Tenting and rough-in inspection passed. Piping can be covered. I noted a pin hole leak on a fitting that will need to be repaired prior to a hydro test.
FIR14-00783 INSP-Sprinkler Rough-in/Hydro6/22/20156/22/20156/22/2015 1:42:54 PMPPASS
Underground hydro from the backflow at the tank to the inside riser passed.
FIR11-00195 INSP-Final Inspection6/22/20156/22/20156/22/2015 10:27:46 AMPPASS
Permit finaled
FIR15-00415 INSP-Sprinkler Rough-in6/19/20156/22/20156/22/2015 10:26:55 AMPPASS
Overhead rough in inspection passed. Piping can be covered.
FIR15-00415 INSP-Sprinkler Rough-in/Hydro6/19/20156/22/20156/22/2015 9:01:21 AMPFAIL
Overhead hydro inspection failed due to puddles on the floor and I will need the pendant heads cut in prior to a hydro test.
FIR11-00096 INSP-Final Inspection6/22/20156/22/20156/22/2015 8:25:14 AMPCANC
I set up wrong inspection number
FIR15-00216 INSP-Sprinkler Rough-in6/19/20156/22/20156/22/2015 8:23:36 AMAPASS
Underground supply line cover passed
FIR15-00219 INSP-Sprinkler Rough-in6/19/20156/22/20156/22/2015 8:22:37 AMAPASS
Underground supply line cover passed.