FIR15-00399
| INSP-Sprinkler Rough-in | 6/22/2015 | 6/22/2015 | 6/22/2015 3:06:58 PM | P | PART |
|
|
Water Main to supply fire sprinkler risers will be installed at a later date, contractor installed piping under the footing and stubbed up for fire sprinkler riser install. Undeground piping installed approximately 20ft out from footing, contractor will finish fire line when water main is installed. Gave approval for covering the underground piping that is now installed.
|
FIR15-00056
| INSP-Final Inspection | 6/19/2015 | 6/22/2015 | 6/22/2015 11:44:11 AM | A | PASS |
|
|
Previously noted items corrected, fire alarm inspection/test passed/complete
|
FIR15-00381
| INSP-Sprinkler Rough-in | 6/19/2015 | 6/22/2015 | 6/22/2015 9:16:41 AM | A | PASS |
|
|
Fire Sprinkler rough in/cover inspection passed/complete
|