Inspections for the day of: Thursday, June 22, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01372 General Inspection6/22/20176/22/20176/27/2017 12:05:07 PM CANC
ESC17-00571 General Inspection6/20/20176/22/20176/27/2017 10:24:22 AMPCANC
ESC17-00445 General Inspection6/21/20176/22/20176/27/2017 9:42:10 AMPCANC
ESC15-01579 Complaint Inspection6/22/20176/22/20176/26/2017 4:30:15 PMPPEND
Fence follow up.

Dirt pushing fence out into Greenbelt lane has been removed as requested.

Corrections needed:
- remove and replace damaged sections of chain link fence to stop obstruction of Greenbelt path area.

- need to sweep up in southeast corner of site. Unprotected stockpile should be removed or have a perimeter sediment control installed.
ESC16-01156 General Inspection6/22/20176/22/20176/23/2017 3:10:03 PM PASS
Signs complete. Kensingtion main site permit is still open.
ESC16-01022 Aging Inspection6/22/20176/22/20176/23/2017 3:06:18 PM CANC
ESC16-01155 Aging Inspection6/22/20176/22/20176/23/2017 3:06:07 PM CANC
ESC15-00504 General Inspection6/22/20176/22/20176/23/2017 3:06:00 PM CANC
ESC16-00978 Aging Inspection6/22/20176/22/20176/23/2017 3:05:52 PM CANC
ESC16-01376 General Inspection6/22/20176/22/20176/23/2017 8:58:53 AM PASS
TI complete. No disturbed area or loose building materials or temporary BMPs onsite.
ESC17-00362 Complaint Inspection6/22/20176/22/20176/22/2017 4:36:49 PMPPEND
Concrete pump truck leaked some oil and conducted illicit chute washout without containment.

RP with Harding Homes Jason and Ryan on site. Floor dry was put on top of spill area to contain and absorb. Brundage Bone to return to site for full clean up.

Requested that any excess dirt after backfilling be taken offsite.

Will check back tomorrow PM for clean up.
ESC16-01147 General Inspection6/22/20176/22/20176/22/2017 4:34:41 PM CANC
rescheduled for site final
ESC16-00059 Aging Inspection6/22/20176/22/20176/22/2017 4:06:41 PM CANC
ESC16-00057 Aging Inspection6/22/20176/22/20176/22/2017 4:04:09 PM CANC
ESC17-00347 Site Preparation6/22/20176/22/20176/22/2017 4:01:19 PMPPASS
Ron Phone #: ###-####

Initial BMPs for soil removal and demolition of west end of Broadway Albertson's are installed. All surrounding storm drains on Beacon, Grant and Rossi have sediment filter protection.

Water truck will be onsite for dust suppression tomorrow.

Permit sign and SWPPP site map are located on Beacon Street. RP/GC Ron was onsite for site inspection & conference.

Approved for construction.