MEC18-02493
| Final | 6/18/2018 | 6/22/2018 | 6/22/2018 4:02:51 PM | P | PASS |
|
|
Please call Karen 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby- A/C coil co ok
|
MEC18-02257
| Rough-in | 6/22/2018 | 6/22/2018 | 6/22/2018 3:40:46 PM | P | PART |
|
|
cover - call mark Phone #: ###-#### Inspection requested via web by Brandon Sorensen- some ceiling grid is not installed yet where a return grille will be located. need to see return in ceiling before full R/I- ceiling ok for cover where grid is installed
|
MEC18-02596
| Final | 6/19/2018 | 6/22/2018 | 6/22/2018 2:36:42 PM | P | FAIL |
|
|
CALL (HOMEOWNER) CHARLOTTE @ # LISTED WHEN EN ROUTE FOR FINAL INSPECTION. PREFERS AROUND 2 P.M. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING- need to seal lineset penetration
|
MEC17-05719
| Final | 6/22/2018 | 6/22/2018 | 6/22/2018 2:07:04 PM | P | FAIL |
|
|
Margeaux should be home, you might call before coming just to make sure, her number is. ###-####. Thanks Phone #: ###-#### Inspection requested via web by Steve Canfield- drip legs on gas line ok- light in attic ok- need to finish taping lineset insulation completely- need to see certification on duct blast from Beeline and u can send it to my email jreynolds@cityofboise.org
|
MEC18-02884
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 2:03:15 PM | P | CANC |
|
|
Please call John to ensure install is complete. Thank you! ###-#### Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
|
MEC18-02883
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 1:27:20 PM | P | NH |
|
|
Please call John to ensure install is complete. ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Rick Borg - homeowner not home reschedule
|
MEC18-02740
| Final | 6/19/2018 | 6/22/2018 | 6/22/2018 1:14:54 PM | P | NR |
|
|
Field super: Chad Robertson requesting a phone call from inspector before heading to inspect. Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
MEC18-02915
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 12:49:19 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace ac coil co ok
|
MEC18-01928
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 12:05:13 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- No Man J. on site
|
MEC18-00206
| Final | 6/22/2018 | 6/22/2018 | 6/22/2018 11:50:26 AM | P | PART |
|
|
Contact Name: Jason Davidson Phone #: ###-#### Inspection requested via web by RM Mechanical- dryer vents ok- pool equipment room need to see ductless spilt finished- dehumid equipment condensate leaking- condensate on two ductless splits in laundry room need finished - all condensates on outside of building need terminated with an elbow down- will check roof on final inspection
|
MIS18-00239
| MEC-Conference | 6/21/2018 | 6/22/2018 | 6/22/2018 10:43:16 AM | A | FAIL |
|
|
a sper Jack R-work w/o permits mechanical work is being done with out permits- left notice on front door stop work order
|
MEC18-00270
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 10:13:55 AM | A | PASS |
|
|
Final inspection ; Contact Todd 20 minutes prior. Thank you Phone #: ###-#### Inspection requested via web by Kim Adams- final ok- card signed
|
MEC18-02001
| Rough-in | 6/15/2018 | 6/22/2018 | 6/22/2018 9:38:27 AM | A | PASS |
|
|
CAROL ###-#### PLEASE CALL WITH ETA Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace upstairs R/I ok- fireplace downstairs R/I ok- will want to see co installed at final
|
MEC18-02577
| Final | 6/20/2018 | 6/22/2018 | 6/22/2018 9:15:36 AM | A | PASS |
|
|
Please contact Jasper for access. Please allow us 30 minutes lead time to meet on site. Phone #: ###-#### Inspection requested via web by Ted Dumont- RTU change out final ok
|
MEC18-02826
| Final | 6/21/2018 | 6/22/2018 | 6/22/2018 8:44:36 AM | A | PASS |
|
|
Russel- house is open Phone #: ###-####- A/C breaker size ok- seal tight for power ok- lineset penetration sealed ok- furnace ac coil co ok
|
MEC18-02926
| Final | 6/22/2018 | 6/22/2018 | 6/22/2018 8:10:57 AM | A | FAIL |
|
|
Inspection requested via web by Floyd Floyd Peek- need to secure grilles to ceiling grid- strap up new flex ducting in back office and return in the west open space
|