ELE19-04505
| Electrical Rough-In | 6/22/2020 | 6/22/2020 | 6/22/2020 1:59:54 PM | P | PASS |
|
|
Corey Hayes is the onsite contact 208.760.0980 Phone #: ###-#### Inspection requested via web by Kevin Perez North underground for ATS, South underground from Storage building to Water pump, North open office area Border tiles only. ok to cover
|
ELE20-01794
| Electrical Rough-In | 6/22/2020 | 6/22/2020 | 6/22/2020 1:31:22 PM | P | PASS |
|
|
Wall cover downstairs bathroom. Tyson is site contact ###-#### Phone #: ###-#### Inspection requested via web by Shane Lott Down Restrooms only ok ot cover
|
ELE18-04426
| Final | 6/18/2020 | 6/22/2020 | 6/22/2020 1:14:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga final ok
|
ELE20-00765
| Final | 6/22/2020 | 6/22/2020 | 6/22/2020 12:56:07 PM | P | PASS |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Troy Ballard Final ok
|
ELE20-01117
| Final | 6/22/2020 | 6/22/2020 | 6/22/2020 12:07:42 PM | P | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk pass
|
ELE20-01907
| Permanent Service | 6/18/2020 | 6/22/2020 | 6/22/2020 11:54:36 AM | P | CANC |
|
|
Contact: Damonn Barr Phone #: ###-#### Inspection requested via web by Deb Gooden Did not disc. power No Permanent service inspection needed
|
ELE20-01907
| Final | 6/22/2020 | 6/22/2020 | 6/22/2020 11:54:26 AM | P | PASS |
|
|
Contact: Damonn Barr Phone #: ###-#### Inspection requested via web by Deb Gooden Final ok
|
ELE20-01907
| Electrical Rough-In | 6/22/2020 | 6/22/2020 | 6/22/2020 11:54:05 AM | P | PASS |
|
|
Contact: Damonn Barr Phone #: ###-#### Inspection requested via web by Deb Gooden Sub panel change only rough in ok
|
MIS20-00202
| ELE-Conference | 6/22/2020 | 6/22/2020 | 6/22/2020 10:20:54 AM | P | DONE |
|
|
framing, egress window installation, PLM and MEC work done without permit per James Ady Phone #: ###-#### Job site has and Electrical permit to cover scope of work
|
ELE20-01470
| Electrical Rough-In | 6/20/2020 | 6/22/2020 | 6/22/2020 10:20:06 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jack Cowan 300.4D Cables shall not be secured within 1 1/4in from face of stud. (Areas through out) 300.4A1 Cables ran through bored hole within 1 1/4in from face of the stud shall have nail plates. (Areas through out) 334.30 Flat cbles shall not be stapled on edge. (Areas through out) 210.52E3 Recep needed on back patio. 210.52 A2 2 receps needed along Living room window wall where concrete has been removed. 300.5B Interior of a conduit ran underground shall be considered a wet location 334.12B4 NM cable shall not be installed in a wet location. Smoke detectors shall be installed.
|
ELE20-02091
| Permanent Service | 6/19/2020 | 6/22/2020 | 6/22/2020 9:29:36 AM | A | PASS |
|
|
access at left gate Phone #: ###-#### Inspection requested via web by David Nelson p/s o/h rec ok
|
ELE20-02063
| Temporary Service | 6/19/2020 | 6/22/2020 | 6/19/2020 3:11:52 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Rodney Monroe Inspection cancelled from web by: Rodney Monroe
|
ELE20-02062
| Temporary Service | 6/19/2020 | 6/22/2020 | 6/19/2020 3:11:36 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Rodney Monroe Inspection cancelled from web by: Rodney Monroe
|