Inspections for the day of: Monday, June 22, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-04932 BLD-Conference6/22/20206/22/20206/22/2020 4:15:56 PMPDONE
Tony, need ten minutes to discuss handrail on front and back porch. Please call or text on your way, I’m never far away. Any time this afternoon is good. Thanks, Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck
BLD20-01301 BLD-Footing6/22/20206/22/20206/22/2020 3:25:48 PMPPART
Bill *screened* Phone #: ###-####
BLD19-04462 BLD-Footing6/19/20206/22/20206/22/2020 2:50:16 PMPPART
Screened- Randy Phone #: ###-####. Work in progress on retaining, north west side.
BLD20-01275 BLD-Wall Bracing6/22/20206/22/20206/22/2020 2:28:40 PMPPART
Phone #: ###-#### Inspection requested via web by Allen Jones. Exterior wall bracing ok. Needs to sheet common wall in garage. Will verify on framing inspection.
BLD20-01439 BLD-Wall Bracing6/22/20206/22/20206/22/2020 2:28:21 PMPPART
Phone #: ###-#### Inspection requested via web by Allen Jones. Exterior wall bracing ok. Needs to sheet common wall in garage. Will verify on framing inspection.
BLD20-01851 BLD-Final6/22/20206/22/20206/22/2020 1:41:17 PMPDONE
Tim *screened* Phone #: ###-####
BLD20-01851 DOC - Permit Finaled6/22/20206/22/20206/22/2020 1:41:08 PMPPASS
All work appeared to b done in accordance with local codes and ordinnances.
BLD20-00468 BLD-Final6/19/20206/22/20206/22/2020 11:03:28 AMAPEND
screened // Brady Phone #: ###-####. Will be ok for perm occ. once plumbing permit issues are resolved.
BLD20-00468 FIRE-Final Inspection6/22/20206/22/20206/22/2020 11:02:11 AMAPASS
screened // Brady Phone #: ###-####
BLD20-01650 BLD-Wall Bracing6/19/20206/22/20206/22/2020 10:26:46 AMAPASS
screened // Isaac Phone #: ###-####
BLD20-01650 BLD-Framing/Rough-in6/22/20206/22/20206/22/2020 10:26:35 AMAPASS
screened // Isaac Phone #: ###-####. Interior steel stud framed walls for restroom remodel. (2 restrooms)
BLD20-01720 BLD-Final6/19/20206/22/20206/22/2020 10:04:28 AMADONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-01720 DOC - Permit Finaled6/22/20206/22/20206/22/2020 10:04:18 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD20-00026 BLD-Concrete6/19/20206/22/20206/22/2020 8:51:13 AMAPART
slab placement, bar, rigid insulation and vapor barrier special inspections. City for flatwork and inlets. Phone #: ###-#### Inspection requested via web by todd smock. Work in progress on installing reinforcement. Noted missed reinforcement from top of grade beam into slab. Will need RFI from engineer fro repair.