BLD96-02800
| INSP - Conference | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - TOLD CONT TO TRY TO HOLD DUST DOWN AS WEV'E HAD COMPLAINT; S
|
BLD97-00044
| INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - BLDG 6 2HR WALL PHASE; C/N W/ FRAME INSP BLD 97-0401
|
BLD97-00401
| INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | | FAIL |
|
|
/ / 340 - C/N; FIRESTOPS, WALL CONST, DOOR INSTALL, SPEC INSP REPORTS
|
BLD97-00401
| INSP - Conference | 6/19/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | A | PASS |
|
|
06/23/97 340 - TAKE DAN S...MEET W/ JOE, ALAN, HP BLDG 6. REQUESTED RESU CORR ADDED AT BSMT
|
BLD97-00913
| INSP - Ceiling grid | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/23/97 340 - (ALREADY DONE......) FRONT OF SPACE OK
|
BLD97-01258
| INSP - Framing/Rough-in | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/23/97 340 - rein
|
BLD97-01484
| INSP - Carpentry | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/23/97 340 - firewalls
|
BLD97-00239
| INSP - Final | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | P | FAIL |
|
|
06/23/97 340 - FINAL REINSPECT; CN, AIR SEAL, FIRE DOOR & WALL
|
BLD96-02800
| INSP - Masonry | 6/23/1997 | 6/23/1997 | 6/23/1997 12:00:00 AM | P | PART |
|
|
06/23/97 340 - GROUT - 6 YARDS AT 10 A.M. ......PEND SPEC INSP
|