PLM00-01910
| Plumbing Rough-in | 6/23/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 08:57:01. Contact: ###-####.
|
PLM00-01481
| Final | 6/23/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 09:30:43. Contact: ###-####.
|
PLM00-01621
| Plumbing Rough-in | 6/23/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PART |
|
|
john--###-#### r/i partial ri ok waste test ok need to run seperate 3/4 water to urinal ,lav. and retest water system 6/23/00 3:23:58 PM
|