ELE00-02181
| Final | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | A | FAIL |
|
|
Work on correction from the day before not done. Reinspect fee $42.00 6/23/00 3:16:19 PM
|
ELE00-02218
| Final | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | A | FAIL |
|
|
Work on corrections from the day before not done. Reinspection fee $42.00. 6/23/00 3:15:20 PM
|
ELE00-02312
| Temporary Service | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | A | PASS |
|
|
Sunshine Electric ###-#### T/S U/G N ok 6/23/00 3:14:51 PM
|
ELE00-02376
| Final | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | A | PASS |
|
|
###-#### call first to meet there Pat Ok final 6/23/00 3:14:41 PM
|
ELE00-02353
| Permanent Service | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/22/2000 at 18:35:38. Contact: ###-####. Fire job- had contractor ground existing service and isolate fire damage- ok service as is. (as per 324) no access. 6/23/00 3:15:48 PM
|
ELE00-01775
| Final | 6/23/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 08:39:05. Contact: ###-####. Ok final 6/26/00 11:43:18 AM
|
ELE00-01005
| Electrical Rough-In | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | FAIL |
|
|
grounding and underground inspection ###-#### Conference 6/26/00 11:43:10 AM
|
ELE00-01125
| Electrical Rough-In | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok final 6/26/00 11:43:03 AM
|
ELE00-01932
| Electrical Rough-In | 6/22/2000 | 6/23/2000 | 6/23/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok cover ceiling 6/26/00 11:42:56 AM
|